(a) Seismograph measurements may be used to increase the charge weight per delay period, provided that the velocity limit of two inches per second of any of the three mutually perpendicular components of ground motion is not exceeded.
(b) Seismograph measurements must be used in each individual blasting operation in which the standard table of distance is not being complied with. Notwithstanding the foregoing, a modified table for blasting operations may be established for use at a particular site, provided that the velocity limit of two inches per second of any of the three mutually perpendicular components of ground motion is not exceeded. Blasting operations without instrumentation will be considered as being within the limits set forth in this subsection if, at a specified location on at least five blasts, instrumentation has shown that the maximum peak particle velocity of any of the three mutually perpendicular components of ground motion at the specified location is 50 percent or less than the limit set forth in this subsection, provided that on all future blasts the scaled distance is equal to or greater than the scaled distance for the instrumented blast.
(c) In estimating the maximum peak particle velocity at a particular position, the following formula shall be used:
where Vo is the maximum ground particle velocity at the seismograph, Do is the distance of the seismograph from the blasting, and D is the distance from the blasting to the position in question and in the same general direction. The distance Do may not be greater than D, and D cannot be more than five times Do. This determined velocity at the site of any dwelling house, public building, school, church, or commercial or institutional building normally occupied shall not exceed the two inches per second limit.
Cite this article: FindLaw.com - Georgia Code Title 25. Fire Protection and Safety § 25-8-5 - last updated March 28, 2024 | https://codes.findlaw.com/ga/title-25-fire-protection-and-safety/ga-code-sect-25-8-5/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature or via Westlaw before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw's Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)