(1) Whenever the construction, reconstruction, clean out or repair of a drain makes necessary the removal or raising of a utility installation in order to permit the passage of a dredge or other machinery or whenever the lowering of an underground utility installation is necessary in order to provide effective drainage, the owner of the utility installation, upon being given 30 days' written notice stating the place where such dredge or machinery will pass or that lowering is necessary to provide effective drainage, shall remove, raise or lower the utility installation as requested by the board. Except as provided in sub. (3), the expenses involved in such removal, raising or lowering shall be borne by the drainage district or as provided by mutual agreement between the drainage board and the owner of the utility installation.
(2) If after the 30 days' notice specified in sub. (1) the owner of the utility installation fails to remove, raise or lower the same, the board may do so and may recover from the owner of the installation the cost of the removal, raising or lowering.
(3) Whenever an underground utility installation is being laid or relaid across a drainage district's drain, the owner of the utility installation shall consult with the drainage board having jurisdiction of such district for the purpose of determining the grade at which such drain was laid out. If an underground utility installation is laid at a grade higher than the grade at which the drain was laid out, the expenses involved in any future lowering of the utility installation shall be borne by the owner of the utility installation unless the owner was misled by the drainage board as to the proper grade at which to lay the utility installation. This subsection applies only to work done after June 13, 1964.
(4) In this section “utility installation” includes any sluice or pipe carrying any gas or liquid, or any wire, conduit or cable used for conducting electricity or for any other purpose, whether or not such installation is owned by a public utility.
Cite this article: FindLaw.com - Wisconsin Statutes Floods and Drainage (Ch. 87 to 89) § 88.67. Construction and repair of drains crossing utility installations; laying utility installations across drains - last updated January 01, 2025 | https://codes.findlaw.com/wi/floods-and-drainage-ch-87-to-89/wi-st-88-67/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)