The department shall, in cooperation with environmental regulatory authorities:
(1) Identify and document environmental resources in the development of the statewide multimodal plan under RCW 47.06.040;
(2) Allow for public comment regarding changes to the criteria used for prioritizing projects under chapter 47.05 RCW before final adoption of the changes by the commission;
(3) Use an environmental review as part of the project prospectus identifying potential environmental impacts, mitigation, the utilization of the mitigation option available in RCW 90.74.040, and costs during the early project identification and selection phase, submit the prospectus to the relevant environmental regulatory authorities, and maintain a record of comments and proposed revisions received from the authorities;
(4) Actively work with the relevant environmental regulatory authorities during the design alternative analysis process and seek written concurrence from the authorities that they agree with the preferred design alternative selected;
(5) Develop a uniform methodology, in consultation with relevant environmental regulatory authorities, for submitting plans and specifications detailing project elements that impact environmental resources, and proposed mitigation measures including the mitigation option available in RCW 90.74.040, to the relevant environmental regulatory authorities during the preliminary specifications and engineering phase of project development;
(6) Screen construction projects to determine which projects will require complex or multiple permits. The permitting authorities shall develop methods for initiating review of the permit applications for the projects before the final design of the projects;
(7) Conduct special prebid meetings for those projects that are environmentally complex; and
(8) Review environmental considerations related to particular projects during the preconstruction meeting held with the contractor who is awarded the bid.
Cite this article: FindLaw.com - Washington Revised Code Title 47. Public Highways and Transportation § 47.01.300. Environmental review of transportation projects--Cooperation with other environmental regulatory authorities - last updated January 01, 2025 | https://codes.findlaw.com/wa/title-47-public-highways-and-transportation/wa-rev-code-47-01-300/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)