Current as of January 01, 2025 | Updated by Findlaw Staff
A. As used in this section:
“Biomass” means organic material that is available on a renewable or recurring basis, including:
1. Forest-related materials, including mill residues, logging residues, forest thinnings, slash, brush, low-commercial value materials or undesirable species, and woody material harvested for the purpose of forest fire fuel reduction or forest health and watershed improvement;
2. Agricultural-related materials, including orchard trees, vineyard, grain or crop residues, including straws, aquatic plants and agricultural processed co-products and waste products, including fats, oils, greases, whey, and lactose;
3. Animal waste, including manure and slaughterhouse and other processing waste;
4. Solid woody waste materials, including landscape trimmings, waste pallets, crates and manufacturing, construction, and demolition wood wastes, excluding pressure-treated, chemically treated or painted wood wastes and wood contaminated with plastic;
5. Crops and trees planted for the purpose of being used to produce energy;
6. Landfill gas, wastewater treatment gas, and biosolids, including organic waste byproducts generated during the wastewater treatment process; and
7. Municipal solid waste, excluding tires and medical and hazardous waste.
“Expedited process” means a process that (i) requires the applicant to pay fees to the Commonwealth in connection with the issuance and processing of the permit application that do not exceed $50 and (ii) has a duration, from receipt of a complete permit application until final action by the Department on the application, not longer than 60 days.
“Qualified energy generator” means a commercial facility located in the Commonwealth with the capacity annually to generate no more than five megawatts of electricity, or produce the equivalent amount of energy in the form of fuel, steam, or other energy product, that is generated or produced from biomass, and that is sold to an unrelated person or used in a manufacturing process.
B. The Department shall develop an expedited process for issuing any permit that it is required to issue for the construction or operation of a qualified energy generator. The development of the expedited permitting process shall be in accordance with subdivision A 8 of § 2.2-4006; however, if the construction or operation of a qualified energy generator is subject to a major new source review program required by § 110(a)(2)(C) of the federal Clean Air Act, this section shall not apply.
Cite this article: FindLaw.com - Virginia Code Title 10.1. Conservation § 10.1-1308.1. Streamlined permitting process for qualified energy generators - last updated January 01, 2025 | https://codes.findlaw.com/va/title-10-1-conservation/va-code-sect-10-1-1308-1/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)