Learn About The Law
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Current as of January 01, 2025 | Updated by Findlaw Staff
As used in this chapter:
(1) “Board” means the Board of Water Resources.
(2) “Committee” means the Project Management Committee created in Section 73-28-105.
(3)(a) “Construction costs” means all costs related to the construction of the project, including the environmental mitigation costs.
(b) Construction costs include:
(i) acquisition of land and rights-of-way;
(ii) board and division expenses related to the project;
(iii) compensation for impairment of existing water rights;
(iv) construction of the project;
(v) design;
(vi) engineering;
(vii) environmental studies;
(viii) legal work;
(ix) permitting;
(x) planning; and
(xi) rebuilding and relocating highways or other facilities affected by the project.
(4) “Developed water” means surface water developed by the project.
(5) “District” means:
(a) the Central Iron County Water Conservancy District;
(b) the Kane County Water Conservancy District;
(c) the Washington County Water Conservancy District; or
(d) any combination of those districts listed in Subsections (5)(a) through (c).
(6) “Division” means the Division of Water Resources.
(7) “Environmental mitigation costs” means costs associated with obtaining permits required by federal, state, or local governmental agencies.
(8) “Preconstruction costs” means any of the following costs incurred before project construction begins:
(a) planning;
(b) design;
(c) engineering studies;
(d) legal work;
(e) permitting;
(f) acquisition of land and rights-of-way;
(g) compensation for impairment of existing water rights;
(h) environmental studies; or
(i) any combination of Subsections (8)(a) through (h).
(9)(a) “Project” means the Lake Powell Pipeline project and associated facilities, including:
(i) facilities associated with environmental mitigation;
(ii) hydroelectric generating works and incidental electrical facilities;
(iii) pipelines; and
(iv) pumping stations.
(b) Notwithstanding Subsection (9)(a), associated facilities do not include the local facilities necessary for the treatment and local delivery of the developed water.
(10) “Project costs” include preconstruction costs, construction costs, and project operation, maintenance, repair, and replacement costs.
Cite this article: FindLaw.com - Utah Code Title 73. Water and Irrigation § 73-28-103. Definitions - last updated January 01, 2025 | https://codes.findlaw.com/ut/title-73-water-and-irrigation/ut-code-sect-73-28-103/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)