Learn About The Law
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Current as of January 01, 2024 | Updated by Findlaw Staff
(a) The commission may grant a variance from the contemporaneous reclamation requirement of Section 134.092(a)(16) for specific areas within the reclamation plan to permit underground mining operations before reclamation if:
(1) the applicant proposes to combine surface mining operations with underground mining operations to assure maximum practical recovery of the coal resources; and
(2) the commission finds in writing that:
(A) the applicant has presented, as part of the permit application, specific, feasible plans for the proposed underground mining operations;
(B) the proposed underground mining operations are necessary or desirable to assure maximum practical recovery of the coal resource and will avoid multiple disturbances of the surface;
(C) the applicant has satisfactorily demonstrated that:
(i) the plan for the underground mining operations conforms to requirements for underground mining in the jurisdiction; and
(ii) permits necessary for the underground mining operations have been issued by the appropriate authority;
(D) the applicant has shown that the areas proposed for the variance are necessary for implementing the proposed underground mining operations;
(E) substantial environmental damage, either on or off the site, will not result from the delay in completing reclamation as required by this chapter; and
(F) provisions for the off-site storage of spoil will comply with Section 134.106.
(b) Liability under the bond filed by the applicant with the commission under Section 134.121 must extend for the duration of the underground mining operations and until Sections 134.092 through 134.106 and Sections 134.128 through 134.134 have been complied with.
(c) The commission must adopt specific rules to govern the granting of a variance under this section and may impose additional requirements it considers necessary.
(d) The commission shall review a variance granted under this section not later than the third anniversary of the date the permit is issued.
Cite this article: FindLaw.com - Texas Natural Resources Code - NAT RES § 134.102. Variance to Permit Underground Mining Operations Before Reclamation - last updated January 01, 2024 | https://codes.findlaw.com/tx/natural-resources-code/nat-res-sect-134-102/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)