Learn About the Law
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Current as of January 01, 2023 | Updated by FindLaw Staff
(1) The Department of Consumer and Business Services may adopt rules regarding installation permits and operating permits. The rules may include, but need not be limited to, rules creating standardized forms, establishing operating permit fees, establishing permit cycles and setting terms and conditions for permit validity.
(2) Upon timely receipt of an installation permit fee, the department may issue an installation permit, perform an installation inspection and issue a temporary operating authorization.
(3) Upon timely receipt of an operating permit fee, the department may issue or renew an operating permit and may perform a periodic inspection if required during the operating permit cycle.
(4) Except as provided in ORS 480.525 and 480.600, installation permit fees are as follows:
(a) For boilers, $175.
(b) For pressure vessels, $125.
(5) Except as provided in ORS 480.600, maximum operating permit fees per year are as follows:
|
|
||||
(a) |
Power boilers of 15 horsepower or less․․․․․․․․․․․․․ |
$ |
110 |
|
|
(b) |
Other boilers of 15 horsepower or less․․․․․․․․․․․․․ |
$ |
55 |
||
(c) |
Power boilers greater than 15 horsepower to 100 horsepower |
$ |
110 |
||
(d) |
Other boilers greater than 15 horsepower to 100 horsepower |
$ |
55 |
||
(e) |
Power boilers greater than 100 horsepower to 500 horsepower |
$ |
110 |
||
(f) |
Other boilers greater than 100 horsepower to 500 horsepower |
$ |
55 |
||
(g) |
Power boilers greater than 500 horsepower․․․․․․․․․․ |
$ |
110 |
||
(h) |
Other boilers greater than 500 horsepower․․․․․․․․․․ |
$ |
55 |
||
(i) |
Notwithstanding paragraphs (a) to (h) of this subsection, all cast iron boilers |
$ |
55 |
||
(j) |
Pressure vessels having a product volume of 20 cubic feet or less |
$ |
50 |
||
(k) |
Pressure vessels having a product volume greater than 20 cubic feet |
$ |
50 |
(6) For a reinspection, the fee is $75.
(7) For the submission of plans and other pertinent data when required, for each boiler or pressure vessel, the fee is $78.
Cite this article: FindLaw.com - Oregon Revised Statutes Protection from Fire § 480.595 - last updated January 01, 2023 | https://codes.findlaw.com/or/title-38-protection-from-fire/or-rev-st-sect-480-595/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature or via Westlaw before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw's Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)