U.S. Federal and State Cases, Codes, and Articles
Select a tab to search United States Cases, Codes, or Articles
U.S. Federal and State Cases, Codes, and Articles
Select a tab to search United States Cases, Codes, or Articles
Search for cases
Indicates required field
Search by keyword or citation
Indicates required field
Search blogs, article pages, and cases and codes
Indicates required field
Current as of May 06, 2021 | Updated by FindLaw Staff
A. Except as provided in Subsection D of this section, any person, association or corporation, public or private, the state or the United States intending to construct a dam shall file applications for appropriations and use of water pursuant to Section 72-5-1, 72-5-22, 72-5-23 or 72-5-24 NMSA 1978.
B. Any person, association or corporation, public or private, the state or the United States intending to construct or operate a dam shall submit detailed plans to the state engineer for approval before construction or operation of the dam, except for a dam that:
(1) is less than twenty-five feet in height from the lowest natural ground surface elevation at the downstream toe of the dam to the crest of the dam and has a storage capacity of less than fifty acre-feet of water;
(2) is less than six feet in height from the lowest natural ground surface elevation at the downstream toe of the dam to the crest of the dam, regardless of storage capacity; or
(3) has a storage capacity of fifteen acre-feet or less of water, regardless of height.
C. If the state engineer finds that the dam design and operational plan are safe, the state engineer shall approve the plans.
D. Filing an application for the appropriation and use of water is not required for the construction or operation of a flood or erosion control dam; provided that a flood or erosion control dam shall not store water for more than ninety-six hours unless a longer duration time is authorized by the state engineer and water stored shall not be placed to any beneficial use unless specifically authorized by the state engineer.
E. The state engineer shall determine how the height, storage capacity and storage duration for all dams are calculated or measured and shall prescribe the form in which dam design plans and operational plans are submitted.
Cite this article: FindLaw.com - New Mexico Statutes Chapter 72. Water Law § 72-5-32. Construction and operation of dams; state engineer authority - last updated May 06, 2021 | https://codes.findlaw.com/nm/chapter-72-water-law/nm-st-sect-72-5-32/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature or via Westlaw before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw's Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)