Subdivision 1. Permit not required. The following projects do not constitute the construction of a large energy infrastructure facility and may be constructed without a permit issued by the commission:
(1) maintaining or repairing an existing large energy infrastructure facility within an existing site or right-of-way;
(2) adding equipment at an existing substation that does not (i) require more than a one-acre expansion of the land needed for the substation, and (ii) involve an increase in the voltage or changes in the location of existing transmission lines, except that up to the first five transmission line structures outside the substation may be moved to accommodate the equipment additions, provided the structures are not moved more than 500 feet from the existing right-of-way;
(3) reconductoring or reconstructing a high-voltage transmission line that does not result in a change to voltage or a change in right-of-way;
(4) relocating a high-voltage transmission line that is required by a local or state agency as part of road, street, or highway construction;
(5) converting the fuel source of a large electric power generating plant to natural gas, provided the plant is not expanded beyond the developed portion of the plant site; and
(6) starting up an existing large electric power generating plant that has been closed for any period of time at no more than the large electric power generating plant's previous capacity rating and in a manner that does not involve changing the fuel or expanding the developed portion of the plant site.
Subd. 2. Amendment. If a modification or other change to an existing large energy infrastructure facility does not qualify for an exception under subdivision 1, the modification or change may qualify as an amendment undersection 216I.09.
Subd. 3. Notice. A person that proposes to implement changes to a large energy infrastructure facility under subdivision 1, clauses (2) to (5), must notify the commission in writing at least 30 days before commencing construction of the modification or change.
Cite this article: FindLaw.com - Minnesota Statutes Utilities (Ch. 216-216H) § 216I.11. Permitting requirements; exceptions for certain facilities - last updated January 01, 2025 | https://codes.findlaw.com/mn/utilities-ch-216-216h/mn-st-sect-216i-11/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)