Subdivision 1. General criteria. A design-build contracting procedure authorized undersections 161.3410to161.3426may be used for a specific project only after the commissioner determines that awarding a design-build contract will serve the public interest.
Subd. 2. Specific criteria. The commissioner shall use the following criteria as the minimum basis for determining when to use the design-build method of project delivery:
(1) the extent to which it can adequately define the project requirements in a proposed scope of the design and construction desired;
(2) the time constraints for delivery of the project;
(3) the capability and experience of potential contractors with the design-build method of project delivery or similar experience;
(4) the suitability of the project for use of the design-build method of project delivery with respect to time, schedule, costs, and quality factors;
(5) the capability of the Department of Transportation to manage the project, including the employment of experienced personnel or outside consultants;
(6) the capability of the Department of Transportation to oversee the project with individuals or design-build firms who are familiar and experienced with the design-build method of project delivery or similar experience;
(7) the lack of ability and availability of any current state employee to perform the services called for by the contract;
(8) the original character of the product or the services;
(9) the work to be performed on the project is necessary to the agency's achievement of its statutory responsibilities and there is statutory authority to enter into the contract; and
(10) other criteria the commissioner deems relevant and states in writing in its determination to utilize the design-build method of project delivery.
Cite this article: FindLaw.com - Minnesota Statutes Transportation (Ch. 160-174A) § 161.3414. Determination to use design-build selection method - last updated January 01, 2025 | https://codes.findlaw.com/mn/transportation-ch-160-174a/mn-st-sect-161-3414/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)