Current as of January 01, 2025 | Updated by Findlaw Staff
(a) If the Department finds that the probable total annual production at all locations of a surface coal mining operator will not exceed 300,000 tons, the cost of the following activities, which shall be performed by a qualified public or private laboratory or such other public or private qualified entity designated by the Department, shall be assumed by the Department upon written request of the operator in connection with a permit application:
(1) The determination of probable hydrologic consequences required by § 15-505(c)(4) of this subtitle, including engineering analyses and designs necessary for the determination;
(2) The development of cross-section maps and plans required by § 15-505(c)(7) of this subtitle;
(3) The geologic drilling and statement of results of test borings and core samplings required by § 15-505(c)(3) of this subtitle;
(4) The collection of any archaeological and historical information required by the Department and the preparation of plans necessitated thereby;
(5) Preblast surveys required by the Department; and
(6) The collection of site-specific resource information and production of protection and enhancement plans for fish and wildlife habitats and other environmental values required by the Department under this subtitle.
(b) The Department shall provide or assume the cost of training coal operators that meet the qualifications in subsection (a) of this section concerning the preparation of permit applications and compliance with the Maryland Surface Mining Control Program, and shall ensure that qualified coal operators are aware of the assistance available under this section.
(c) A coal operator that receives assistance pursuant to this section shall reimburse the Department for the cost of the services rendered if the Department finds that the operator's actual and attributed annual production of coal for all locations exceeds 300,000 tons during the 12 months immediately following the date on which the operator is issued the surface coal mining and reclamation permit.
Cite this article: FindLaw.com - Maryland Code, Environment § 15-519 - last updated January 01, 2025 | https://codes.findlaw.com/md/environment/md-code-envir-sect-15-519/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)