CAPITAL PROJECTS BUDGET
(1) Capital Construction Fund Appropriations and Reauthorizations: Moneys in the Capital Construction Fund are appropriated for the following capital projects subject to the conditions and procedures in this Act. Items listed without appropriated amounts are previously authorized for which no additional amount is required. These items are listed in order to continue their current authorization into the 2024-2026 fiscal biennium. Unless otherwise specified, reauthorized projects shall conform to the original authorization enacted by the General Assembly.
(2) Expiration of Existing Line-Item Capital Construction Projects: All appropriations to existing line-item capital construction projects expire on June 30, 2024, unless reauthorized in this Act with the following exceptions: (a) A construction or purchase contract for the project shall have been awarded by June 30, 2024; (b) Permanent financing or a short-term line of credit sufficient to cover the total authorized project scope shall have been obtained in the case of projects authorized for bonds, if the authorized project completes an initial draw on the line of credit within the fiscal biennium immediately subsequent to the original authorization; and (c) Grant or loan agreements, if applicable, shall have been finalized and properly signed by all necessary parties by June 30, 2024. Notwithstanding the criteria set forth in this subsection and KRS 45.229 and 45.770(5)(d), funds appropriated to 2024-2026 fiscal biennium nonstatutory maintenance pools shall not lapse and shall carry forward.
(3) Bond Proceeds Investment Income: Investment income earned from bond proceeds beyond that which is required to satisfy Internal Revenue Service arbitrage rebates and penalties and excess bond proceeds upon the completion of a bond-financed capital project shall be used to pay debt service according to the Internal Revenue Service Code and accompanying regulations.
(4) Appropriations for Projects Not Line-Itemized: Inasmuch as the identification of specific projects in a variety of areas of the state government cannot be ascertained with absolute certainty at this time, amounts are appropriated for specific purposes to projects which are not individually identified in this Act in the following areas: Kentucky Infrastructure Authority Water and Sewer projects; Flood Control projects; Repair of State-Owned Dams; Guaranteed Energy Savings Performance Contract projects; Wetland and Stream Mitigation projects; General Fund, Investment Income, Restricted Fund, Federal Fund, Bond-funded, and Aircraft maintenance pools; Economic Development projects, which shall include authorization for the High-Tech Construction Pool and the High-Tech Investment Pool; Postsecondary Education pools; Legacy System Retirement Pool; Wastewater Treatment Upgrades Pool; Utility Infrastructure Replacement Pool; and State Fair Board property improvements. Notwithstanding any statute to the contrary, projects estimated to cost $1,000,000 and over and equipment estimated to cost $200,000 and over shall be reported to the Capital Projects and Bond Oversight Committee.
(5) Capital Construction and Equipment Purchase Contingency Account: If funds in the Capital Construction and Equipment Purchase Contingency Account are not sufficient, then up to $1,000,000 of expenditures are to be paid first from the General Fund Surplus Account (KRS 48.700), if available, or from the Budget Reserve Trust Fund Account (KRS 48.705), subject to the conditions and procedures provided in this Act.
(6) Emergency Repair, Maintenance, and Replacement Account: If funds in the Emergency Repair, Maintenance, and Replacement Account are not sufficient, then up to $2,500,000 of expenditures are to be paid first from the General Fund Surplus Account (KRS 48.700), if available, or from the Budget Reserve Trust Fund Account (KRS 48.705), subject to the conditions and procedures provided in this Act.
(7) Appropriation-Supported Debt: To lower the cost of borrowing, the agencies identified in KRS 45A.850(1)(a) and (2)(a) are authorized to refinance appropriation-supported debt obligations that have previously been issued and for which the Commonwealth is currently making lease-rental payments to meet the current debt service requirements. Such action is authorized provided that the principal amount of any such debt obligation is not increased and the term of the debt obligation is not extended. Any such refinancing shall still be subject to the requirements of KRS 45.750 to 45.810 for reporting to the Capital Projects and Bond Oversight Committee.
(8) Cash Defeasance: State agencies identified in KRS 45A.850(1)(a) and (2)(a) are authorized to economically or legally defease debt obligations that have previously been issued by the agency, or through a third party but for which the Commonwealth or the agency is currently making lease-rental payments to meet the current debt service requirements. If Restricted Funds are used for the defeasance of bonds, the agency may use a prior Agency Bond authorization for a new debt obligation so long as the debt service for the new debt obligation is not greater than the debt service of the defeased bonds and the term of the new debt obligation is not greater than the term of the defeased bonds. Any such refinancing shall still be subject to the requirements of KRS 45.750 to 45.810 for reporting to the Capital Projects and Bond Oversight Committee.
(9) Public-Private Partnerships Sunset: Notwithstanding KRS 45A.077(8), the utilization of the public-private partnership delivery method for projects of at least $25,000,000 does not need to be explicitly authorized by the General Assembly.
A. GENERAL GOVERNMENT
|
Budget Units |
2023-24 |
2024-25 |
2025-26 |
||
|
1. |
VETERANS' AFFAIRS |
||||
|
001. |
Maintenance Pool--2024-2026 |
||||
|
Investment Income |
-0- |
1,000,000 |
1,000,000 |
||
|
002. |
Renovate Interior/Exterior Thomson-Hood Veterans Center |
||||
|
Bond Funds |
-0- |
-0- |
7,000,000 |
||
|
003. |
Replace Roof Eastern Kentucky Veterans Center |
||||
|
Bond Funds |
-0- |
1,500,000 |
-0- |
||
|
004. |
Replace Exterior Lighting Thomson-Hood Veterans Center |
||||
|
Bond Funds |
-0- |
1,500,000 |
-0- |
||
|
005. |
Replace Fire System Western Kentucky Veterans Center |
||||
|
Bond Funds |
-0- |
1,500,000 |
-0- |
||
|
006. |
Replace Roof Western Kentucky Veterans Center |
||||
|
Bond Funds |
-0- |
1,500,000 |
-0- |
||
|
007. |
Expansion of Columbarium Wall Kentucky Veterans Cemetery West |
||||
|
Federal Funds |
1,281,000 |
-0- |
-0- |
||
|
008. |
Expansion of Columbarium Wall Kentucky Veterans Cemetery Central |
||||
|
Federal Funds |
1,862,000 |
-0- |
-0- |
||
|
009. |
Radcliff Veterans Center HVAC System Replacement |
||||
|
Bond Funds |
-0- |
9,000,000 |
-0- |
||
|
2. |
KENTUCKY INFRASTRUCTURE AUTHORITY |
||||
|
001. |
KIA Fund A--Federally Assisted Wastewater Program |
||||
|
Federal Funds |
38,784,000 |
51,881,000 |
54,291,000 |
||
|
Bond Funds |
-0- |
4,563,000 |
9,369,000 |
||
|
Agency Bonds |
-0- |
-0- |
30,000,000 |
||
|
TOTAL |
38,784,000 |
56,444,000 |
93,660,000 |
||
|
002. |
KIA Fund F--Drinking Water Revolving Loan Program |
||||
|
Federal Funds |
69,596,000 |
84,218,000 |
86,546,000 |
||
|
Bond Funds |
-0- |
3,766,000 |
8,286,000 |
||
|
Agency Bonds |
-0- |
-0- |
30,000,000 |
||
|
TOTAL |
69,596,000 |
87,984,000 |
124,832,000 |
||
|
003. |
KIA Fund B--Infrastructure Revolving Fund |
||||
|
Bond Funds |
-0- |
-0- |
25,000,000 |
||
|
3. |
MILITARY AFFAIRS |
||||
|
001. |
Construct Readiness Center Somerset--Additional |
||||
|
Federal Funds |
-0- |
5,438,000 |
-0- |
||
|
Bond Funds |
-0- |
4,032,000 |
-0- |
||
|
TOTAL |
-0- |
9,470,000 |
-0- |
||
|
002. |
Construct Armory Addition--Shelbyville |
||||
|
Federal Funds |
-0- |
3,000,000 |
-0- |
||
|
Bond Funds |
-0- |
1,000,000 |
-0- |
||
|
TOTAL |
-0- |
4,000,000 |
-0- |
||
|
003. |
Armory Installation Facility Maintenance Pool--2024-2026 |
||||
|
Bond Funds |
-0- |
4,000,000 |
4,000,000 |
||
|
004. |
Bluegrass Station Facility Maintenance Pool--2024-2026 |
||||
|
Restricted Funds |
-0- |
1,000,000 |
1,000,000 |
||
|
005. |
Construct Support Building W. H. Ford Reserve Training Center--Additional |
||||
|
Federal Funds |
-0- |
1,000,000 |
-0- |
||
|
006. |
Extension of Utilities W. H. Ford Training Site |
||||
|
Federal Funds |
-0- |
2,000,000 |
-0- |
||
|
007. |
Construct Improve Sewer System Bluegrass Station |
||||
|
Restricted Funds |
-0- |
5,000,000 |
-0- |
||
|
008. |
Construct Armory 4--Frankfort |
||||
|
Federal Funds |
-0- |
3,000,000 |
-0- |
||
|
Bond Funds |
-0- |
1,000,000 |
-0- |
||
|
TOTAL |
-0- |
4,000,000 |
-0- |
||
|
009. |
Modernization Pool KY National Guard--2024-2026 |
||||
|
Federal Funds |
-0- |
6,000,000 |
-0- |
||
|
Bond Funds |
-0- |
2,000,000 |
-0- |
||
|
TOTAL |
-0- |
8,000,000 |
-0- |
||
|
010. |
Construct Fitness Center Facility at WHFRTC |
||||
|
Federal Funds |
-0- |
5,000,000 |
-0- |
||
|
011. |
Construct Civil Support Team Facility--Additional |
||||
|
Federal Funds |
-0- |
7,200,000 |
-0- |
||
|
012. |
KY Youth Challenge Academy Maintenance Pool--2024-2026 |
||||
|
Investment Income |
-0- |
1,000,000 |
1,000,000 |
||
|
013. |
Upgrade of HVAC JSO |
||||
|
Federal Funds |
-0- |
2,000,000 |
-0- |
||
|
014. |
Construct New Barracks at HLDTS |
||||
|
Federal Funds |
-0- |
3,000,000 |
-0- |
||
|
015. |
Construct New Barracks at WHFRTC--Additional |
||||
|
Federal Funds |
-0- |
1,000,000 |
-0- |
||
|
016. |
Construct HLDTS Athletic Field--Additional |
||||
|
Federal Funds |
-0- |
1,000,000 |
-0- |
||
|
017. |
Restoration Ashland Armory--Phase 1 |
||||
|
Federal Funds |
-0- |
3,000,000 |
-0- |
||
|
Bond Funds |
-0- |
1,000,000 |
-0- |
||
|
TOTAL |
-0- |
4,000,000 |
-0- |
||
|
018. |
Construct HLDTS Drainage Improvement |
||||
|
Federal Funds |
-0- |
2,000,000 |
-0- |
||
|
019. |
Construct Bowman Organizational Maintenance Shop Restoration |
||||
|
Federal Funds |
-0- |
3,000,000 |
-0- |
||
|
020. |
Construct Facilities Operations Maintenance Complex WHFRTC |
||||
|
Federal Funds |
-0- |
3,000,000 |
-0- |
||
|
021. |
Construct Jackson Field Maintenance Shop |
||||
|
Federal Funds |
-0- |
15,000,000 |
-0- |
||
|
022. |
Construct FMS Burlington-Additional |
||||
|
Federal Funds |
-0- |
1,750,000 |
-0- |
||
|
023. |
Bluegrass Station Setzer Properties--Lease |
||||
|
024. |
Bluegrass Station BLDGS 341 & 344--Lease |
||||
|
025. |
Bluegrass Station Building 197--Lease |
||||
|
026. |
Bluegrass Station BLDG 102--Lease |
||||
|
027. |
Bluegrass Station Crumley Hangar BLDG 352--Lease |
||||
|
4. |
DEPARTMENT FOR LOCAL GOVERNMENT |
||||
|
001. |
Flood Control Local Match |
||||
|
Bond Funds |
-0- |
6,000,000 |
6,000,000 |
||
|
5. |
ATTORNEY GENERAL |
||||
|
001. |
Franklin County--Lease |
||||
|
6. |
TREASURY |
||||
|
001. |
Xerox Check Printer |
||||
|
Investment Income |
-0- |
66,000 |
66,000 |
||
|
002. |
Xerox Check Printer--Secondary |
||||
|
Investment Income |
-0- |
66,000 |
66,000 |
||
|
7. |
COMMONWEALTH'S ATTORNEYS |
||||
|
001. |
Jefferson County--Lease |
||||
|
8. |
AGRICULTURE |
||||
|
001. |
Franklin County--Lease |
||||
|
9. |
KENTUCKY RIVER AUTHORITY |
||||
|
001. |
Design and Repair Dam 7 Reauthorization ($6,400,000 Restricted Funds) |
||||
|
002. |
Design Lock 5 Reauthorization ($800,000 Restricted Funds) |
||||
|
003. |
Locks 2 & 3 Upper Guide Wall Repairs Reauthorization ($4,131,000 Restricted Funds) |
||||
|
10. |
SCHOOL FACILITIES CONSTRUCTION COMMISSION |
||||
|
001. |
Offers of Assistance--2022-2024 |
||||
|
Bond Funds |
-0- |
85,000,000 |
-0- |
||
|
002. |
School Facilities Construction Commission Reauthorization ($75,900,000 Bond Funds) |
||||
|
003. |
Special Offers of Assistance--2024-2025 |
||||
|
Bond Funds |
-0- |
61,641,000 |
-0- |
||
|
004. |
Secondary Area Technology Center Renovation Pool--2025-2026 |
||||
|
Bond Funds |
-0- |
-0- |
50,000,000 |
||
|
005. |
School Facility Assistance Fund--2025-2026 |
||||
|
Bond Funds |
-0- |
-0- |
146,696,000 |
||
|
11. |
KENTUCKY COMMUNICATIONS NETWORK AUTHORITY |
||||
|
001. |
KentuckyWired Critical Infrastructure Upgrades |
||||
|
Bond Funds |
-0- |
6,464,000 |
6,463,000 |
||
|
002. |
KentuckyWired Critical Infrastructure Purchases |
||||
|
Bond Funds |
-0- |
12,432,000 |
-0- |
B. ECONOMIC DEVELOPMENT CABINET
(1) Economic Development Bond Issues: Before any economic development bonds are issued, the proposed bond issue shall be approved by the Secretary of the Finance and Administration Cabinet and the State Property and Buildings Commission under KRS 56.440 to 56.590. In addition to the terms and conditions of KRS 154.12-100, administration of the Economic Development Bond Program by the Secretary of the Cabinet for Economic Development is subject to the following guideline: project selection shall be documented when presented to the Secretary of the Finance and Administration Cabinet. Included in the documentation shall be the rationale for selection and expected economic development impact.
(2) Use of New Economy Funds: Notwithstanding KRS 154.12-100, 154.12-278(4) and (5), and 154.20-035, the Secretary of the Cabinet for Economic Development may use funds appropriated in the Economic Development Fund Program, High-Tech Construction/Investment Pool, and the Kentucky Economic Development Finance Authority Loan Pool interchangeably for economic development projects.
|
Budget Units |
2024-25 |
2025-26 |
||
|
1. |
ECONOMIC DEVELOPMENT |
|||
|
001. |
Economic Development Bond Programs--2024-2026 |
|||
|
Bond Funds |
5,000,000 |
5,000,000 |
||
|
002. |
High-Tech Construction/Investment Pool--2024-2026 |
|||
|
Bond Funds |
5,000,000 |
5,000,000 |
||
|
003. |
Kentucky Economic Development Finance Authority Loan Pool--2024-2026 |
|||
|
Bond Funds |
5,000,000 |
5,000,000 |
C. DEPARTMENT OF EDUCATION
|
Budget Units |
2024-25 |
2025-26 |
||
|
1. |
OPERATIONS AND SUPPORT SERVICES |
|||
|
001. |
Maintenance Pool--2024-2026 |
|||
|
Investment Income |
3,100,000 |
-0- |
||
|
002. |
Education Finance Application Phase 2 |
|||
|
Bond Funds |
2,000,000 |
-0- |
||
|
2. |
LEARNING AND RESULTS SERVICES |
|||
|
001. |
Dormitory Cottage Renovation |
|||
|
Investment Income |
500,000 |
-0- |
||
|
002. |
McDaniel/Scoggin Classroom Building Upgrades |
|||
|
Bond Funds |
8,000,000 |
-0- |
||
|
003. |
State Schools Exterior Building Maintenance |
|||
|
Bond Funds |
1,000,000 |
-0- |
||
|
004. |
State Schools Safety and Security Pool |
|||
|
Bond Funds |
1,000,000 |
-0- |
||
|
005. |
Future Farmers of America Activity Center |
|||
|
Bond Funds |
1,000,000 |
-0- |
D. EDUCATION AND LABOR CABINET
|
Budget Units |
2024-25 |
2025-26 |
||
|
1. |
GENERAL ADMINISTRATION AND PROGRAM SUPPORT |
|||
|
001. |
Maintenance Pool--2024-2026 |
|||
|
Investment Income |
500,000 |
500,000 |
||
|
2. |
KENTUCKY EDUCATIONAL TELEVISION |
|||
|
001. |
Maintenance Pool--2024-2026 |
|||
|
Investment Income |
750,000 |
750,000 |
||
|
002. |
KET Capitol Production Center Maintenance Pool--2024-2026 |
|||
|
Investment Income |
500,000 |
500,000 |
||
|
003. |
KET Studio Lighting |
|||
|
General Fund |
1,750,000 |
-0- |
||
|
3. |
LIBRARIES AND ARCHIVES |
|||
|
a. |
General Operations |
|||
|
001. |
Franklin County--Lease |
|||
|
4. |
WORKFORCE DEVELOPMENT |
|||
|
001. |
Maintenance Pool--2024-2026 |
|||
|
Investment Income |
700,000 |
700,000 |
||
|
002. |
Replace Vocational Rehabilitation Case Management System |
|||
|
Federal Funds |
3,180,000 |
-0- |
||
|
003. |
Replace Workforce Innovation and Opportunity Act/Career Development Office Case |
|||
|
Management System |
||||
|
Federal Funds |
2,250,000 |
1,000,000 |
||
|
004. |
Replace Wastewater Treatment Plant--Carl D. Perkins Treatment Facility |
|||
|
Federal Funds |
3,000,000 |
-0- |
||
|
005. |
Replace Unemployment Insurance System Additional Reauthorization ($7,500,000 |
|||
|
General Fund, $30,000,000 Restricted Funds, $10,000,000 Bond Funds) |
||||
|
Restricted Funds |
38,000,000 |
-0- |
||
|
006. |
Kenton County--Lease |
|||
|
007. |
Hardin County--Lease |
E. ENERGY AND ENVIRONMENT CABINET
|
Budget Units |
2023-24 |
2024-25 |
2025-26 |
||
|
1. |
SECRETARY |
||||
|
001. |
Maintenance Pool--2024-2026 |
||||
|
Investment Income |
-0- |
479,000 |
533,000 |
||
|
2. |
ENVIRONMENTAL PROTECTION |
||||
|
001. |
State-Owned Dam Repair--2024-2026 |
||||
|
Bond Funds |
-0- |
22,200,000 |
-0- |
||
|
002. |
Remediate and Cleanup Wiley Property Site |
||||
|
Bond Funds |
-0- |
9,480,000 |
-0- |
||
|
003. |
Remediate and Cleanup State Superfund Sites |
||||
|
Bond Funds |
-0- |
1,038,000 |
1,000,000 |
||
|
004. |
Replace Emergency Response Team Command Unit |
||||
|
Restricted Funds |
275,000 |
-0- |
-0- |
||
|
3. |
NATURAL RESOURCES |
||||
|
001. |
Replace Unsafe Fire Equipment |
||||
|
Bond Funds |
-0- |
1,273,000 |
-0- |
||
|
002. |
Kentucky Abandoned Storage Tank and Orphan Well Program Reauthorization |
||||
|
($1,000,000 General Fund) |
|||||
|
003. |
Remediate and Cleanup Abandoned Storage Tanks and Orphan Wells |
||||
|
General Fund |
-0- |
500,000 |
500,000 |
F. FINANCE AND ADMINISTRATION CABINET
|
Budget Units |
2024-25 |
2025-26 |
||
|
1. |
CONTROLLE |
|||
|
001. |
Upgrade & Enhancement eMARS Systems |
|||
|
Bond Funds |
3,500,000 |
-0- |
||
|
2. |
FACILITIES AND SUPPORT SERVICES |
|||
|
001. |
Guaranteed Energy Savings Performance Contracts |
|||
|
Other Funds |
50,000,000 |
-0- |
||
|
002. |
Maintenance Pool--2024-2026 |
|||
|
Investment Income |
7,500,000 |
7,500,000 |
||
|
003. |
Renovate Cabinet for Human Resources Phase 1 |
|||
|
Bond Funds |
5,000,000 |
-0- |
||
|
004. |
Asphalt Pool |
|||
|
Bond Funds |
1,500,000 |
-0- |
||
|
005. |
Roof Pool |
|||
|
Bond Funds |
3,000,000 |
-0- |
||
|
006. |
Replace Roof for Transportation Building |
|||
|
Bond Funds |
-0- |
8,000,000 |
||
|
007. |
Replace Roof for Central Lab Building |
|||
|
Bond Funds |
8,000,000 |
-0- |
||
|
008. |
Historic Properties Deferred Maintenance Pool--2024-2026 |
|||
|
Bond Funds |
6,000,000 |
-0- |
||
|
009. |
Capitol Annex Renovation |
|||
|
Bond Funds |
168,000,000 |
-0- |
||
|
3. |
COMMONWEALTH OFFICE OF TECHNOLOGY |
|||
|
001. |
Replace and Modernize Legacy Systems |
|||
|
Bond Funds |
5,000,000 |
5,000,000 |
||
|
002. |
Alternate Data Center Lease |
|||
|
003. |
Kentucky Business OneStop (KyBOS) Phase IV Reauthorization ($4,128,000 General |
|||
|
Fund) |
G. HEALTH AND FAMILY SERVICES CABINET
|
Budget Units |
2024-25 |
2025-26 |
||
|
1. |
GENERAL ADMINISTRATION AND PROGRAM SUPPORT |
|||
|
001. |
Maintenance Pool--2024-2026 |
|||
|
Investment Income |
12,154,000 |
12,154,000 |
||
|
2. |
OFFICE FOR CHILDREN WITH SPECIAL HEALTH CARE NEEDS |
|||
|
001. |
Jefferson County--Lease |
|||
|
3. |
BEHAVIORAL HEALTH, DEVELOPMENTAL AND INTELLECTUAL DISABILITIES |
|||
|
001. |
Construct Forensic Psychiatric Hospital--KCPC |
|||
|
Bond Funds |
63,863,000 |
-0- |
||
|
002. |
Upgrade Mechanical Lines--WSH |
|||
|
Bond Funds |
3,985,000 |
-0- |
||
|
003. |
Replace Water Lines--Oakwood |
|||
|
Bond Funds |
4,507,000 |
-0- |
||
|
004. |
Replace HVAC Piping--WSH |
|||
|
Bond Funds |
12,019,000 |
-0- |
||
|
4. |
PUBLIC HEALTH |
|||
|
001. |
Expand Central Laboratory |
|||
|
Bond Funds |
36,450,000 |
-0- |
||
|
5. |
INCOME SUPPORT |
|||
|
001. |
Franklin County--Lease |
|||
|
6. |
COMMUNITY BASED SERVICES |
|||
|
001. |
Kenton County--Lease |
|||
|
002. |
Fayette County--Lease |
|||
|
003. |
Warren County--Lease |
|||
|
004. |
Daviess County--Lease |
|||
|
005. |
Perry County--Lease |
|||
|
006. |
Boone County--Lease |
|||
|
007. |
Hardin County--Lease |
|||
|
008. |
Boyd County--Lease |
|||
|
009. |
Campbell County--Lease |
|||
|
010. |
Johnson County--Lease |
|||
|
011. |
Shelby County--Lease |
|||
|
012. |
Greenup County--Lease |
|||
|
013. |
Muhlenberg County--Lease |
|||
|
014. |
Madison County--Lease |
|||
|
015. |
Marshall County--Lease |
H. JUSTICE AND PUBLIC SAFETY CABINET
|
Budget Units |
2023-24 |
2024-25 |
2025-26 |
||
|
1. |
JUSTICE ADMINISTRATION |
||||
|
001. |
Northern Kentucky Medical Examiner Office--Lease |
||||
|
2. |
CRIMINAL JUSTICE TRAINING |
||||
|
001. |
Maintenance Pool--2024-2026 |
||||
|
Restricted Funds |
-0- |
3,000,000 |
3,000,000 |
||
|
3. |
JUVENILE JUSTICE |
||||
|
001. |
Maintenance Pool--2024-2026 |
||||
|
Investment Income |
-0- |
5,000,000 |
5,000,000 |
||
|
002. |
Renovate Louisville Detention Center Additional Reauthorization ($13,400,000 |
||||
|
General Fund) |
|||||
|
Bond Funds |
-0- |
25,500,000 |
-0- |
||
|
003. |
Renovate Lyndon Facility Additional Reauthorization ($4,500,000 General Fund) |
||||
|
Bond Funds |
-0- |
3,000,000 |
-0- |
||
|
004. |
Retrofit McCracken County Juvenile Detention Center |
||||
|
Bond Funds |
-0- |
11,000,000 |
-0- |
||
|
005. |
Retrofit Breathitt County Juvenile Detention Center |
||||
|
Bond Funds |
-0- |
9,600,000 |
-0- |
||
|
006. |
Retrofit Fayette County Juvenile Detention Center |
||||
|
Bond Funds |
-0- |
2,600,000 |
-0- |
||
|
4. |
STATE POLICE |
||||
|
001. |
Maintenance Pool--2024-2026 |
||||
|
Bond Funds |
-0- |
7,000,000 |
-0- |
||
|
Investment Income |
-0- |
-0- |
5,000,000 |
||
|
TOTAL |
-0- |
7,000,000 |
5,000,000 |
||
|
002. |
Construct New Skills Pad at Training Academy |
||||
|
Bond Funds |
-0- |
3,900,000 |
-0- |
||
|
003. |
Purchase of New Helicopter |
||||
|
Bond Funds |
-0- |
8,000,000 |
-0- |
||
|
004. |
Replace and Repair Various HVAC |
||||
|
Bond Funds |
-0- |
5,000,000 |
-0- |
||
|
005. |
Upgrade Telecommunicator Technology |
||||
|
Bond Funds |
-0- |
2,200,000 |
-0- |
||
|
006. |
Construct Post 1 (Hickory) Radio Room Expansion |
||||
|
Bond Funds |
-0- |
1,000,000 |
-0- |
||
|
007. |
Emergency Radio System Replacement Additional |
||||
|
Bond Funds |
-0- |
47,900,000 |
-0- |
||
|
008. |
Posts 7 (Richmond) & 10 (Harlan) Construction Additional Reauthorization ($8,456,000 |
||||
|
Bond Funds) |
|||||
|
Bond Funds |
-0- |
7,250,000 |
-0- |
||
|
5. |
CORRECTIONS |
||||
|
a. |
Adult Correctional Institutions |
||||
|
001. |
Maintenance Pool--2024-2026 |
||||
|
Bond Funds |
-0- |
20,000,000 |
20,000,000 |
||
|
002. |
Repair Northpoint Training Center--Exterior Dorms Masonry Tuckpoint |
||||
|
Bond Funds |
-0- |
2,320,000 |
-0- |
||
|
003. |
Replace KY State Penitentiary--Gates & Controls at Cellhouses 3, 4, 5, & 6 |
||||
|
Bond Funds |
-0- |
-0- |
5,950,000 |
||
|
004. |
Install Little Sandy Correctional Complex--Furniture Package |
||||
|
Bond Funds |
-0- |
5,000,000 |
-0- |
||
|
005. |
Renovate Northpoint Training Center--Restricted Housing Unit |
||||
|
Bond Funds |
-0- |
1,800,000 |
-0- |
||
|
006. |
Replace Northpoint Training Center--HVAC at Dormitories |
||||
|
Bond Funds |
-0- |
-0- |
4,720,000 |
||
|
007. |
Upgrade Green River Correctional Complex--Full Electrical System |
||||
|
Bond Funds |
-0- |
4,000,000 |
-0- |
||
|
008. |
Assess Statewide Electrical System |
||||
|
Bond Funds |
-0- |
2,000,000 |
-0- |
||
|
009. |
Design Level 4 Prison in Eastern KY |
||||
|
Bond Funds |
-0- |
29,000,000 |
-0- |
||
|
010. |
Replace KY State Penitentiary--Utilities Infrastructure |
||||
|
Bond Funds |
-0- |
4,320,000 |
-0- |
||
|
011. |
Southeast State Correctional Complex--Lease |
||||
|
012. |
Repair and Paint Various Water Towers--Additional |
||||
|
Bond Funds |
-0- |
2,400,000 |
-0- |
||
|
013. |
Relocate Medical Services Phase II |
||||
|
Bond Funds |
-0- |
58,013,000 |
-0- |
||
|
014. |
Eastern Kentucky Correctional Complex--Facade and Structural Repair/Replacement |
||||
|
Bond Funds |
-0- |
85,400,000 |
-0- |
||
|
015. |
Eastern Kentucky Correctional Complex--HVAC Replacement |
||||
|
Bond Funds |
-0- |
80,000,000 |
-0- |
||
|
016. |
Kentucky State Reformatory--Demolition |
||||
|
Bond Funds |
-0- |
-0- |
7,036,000 |
||
|
017. |
Kentucky State Penitentiary Security Fence Additional Reauthorization ($1,517,000 |
||||
|
General Fund) |
|||||
|
General Fund |
2,100,000 |
-0- |
-0- |
||
|
b. |
Community Services and Local Facilities |
||||
|
001. |
Bellevue Probation and Parole--Lease |
||||
|
002. |
Lexington Probation and Parole--Lease |
||||
|
6. |
PUBLIC ADVOCACY |
||||
|
001. |
Franklin County--Lease |
||||
|
002. |
Fayette County--Lease |
||||
|
003. |
Louisville/Jefferson County--Lease |
||||
|
004. |
Case Management System Reauthorization ($1,650,000 General Fund) |
I. POSTSECONDARY EDUCATION
(1) Postsecondary Education Asset Preservation Pool: The Postsecondary Education Asset Preservation Pool provides funding for individual asset preservation, renovation, and maintenance projects at Kentucky's public postsecondary institutions in Education, General, and state-owned and operated residential housing facilities. For fiscal years 2024-2025 and 2025-2026, each project for research institutions shall be matched at 25 percent from funds provided by each research institution. Capital projects as defined in KRS 45.750(1)(f) are hereby authorized from these funds or combination of funds thereof and shall be reported to the Capital Projects and Bond Oversight Committee.
|
Budget Units |
2024-25 |
2025-26 |
||
|
1. |
KENTUCKY HIGHER EDUCATION ASSISTANCE AUTHORITY |
|||
|
001. |
Mobile Outreach Vehicle |
|||
|
Restricted Funds |
950,000 |
-0- |
||
|
2. |
KENTUCKY HIGHER EDUCATION STUDENT LOAN CORPORATION |
|||
|
001. |
Jefferson County--Lease |
|||
|
3. |
EASTERN KENTUCKY UNIVERSITY |
|||
|
001. |
Asset Preservation Pool--2024-2026 |
|||
|
Bond Funds |
25,910,000 |
25,910,000 |
||
|
002. |
Construct New Model Laboratory School Phase II |
|||
|
Bond Funds |
59,100,000 |
-0- |
||
|
003. |
Athletics Capital Improvements Pool--2024-2026 |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
Agency Bonds |
25,000,000 |
-0- |
||
|
Other Funds |
25,000,000 |
-0- |
||
|
TOTAL |
75,000,000 |
-0- |
||
|
004. |
Maintain/Expand Begley Building |
|||
|
Agency Bonds |
40,000,000 |
-0- |
||
|
005. |
Upgrade Campus Infrastructure |
|||
|
Other Funds |
40,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
006. |
Miscellaneous Maintenance Pool--2024-2026 |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
007. |
Innovation and Commercialization Pool--2024-2026 |
|||
|
Restricted Funds |
5,000,000 |
-0- |
||
|
Other Funds |
10,000,000 |
-0- |
||
|
TOTAL |
15,000,000 |
-0- |
||
|
008. |
Improve Campus Pedestrian, Park and Transportation Pool--2024-2026 |
|||
|
Restricted Funds |
3,000,000 |
-0- |
||
|
Agency Bonds |
8,000,000 |
-0- |
||
|
Other Funds |
3,000,000 |
-0- |
||
|
TOTAL |
14,000,000 |
-0- |
||
|
009. |
Campus Data Network Pool--2024-2026 |
|||
|
Restricted Funds |
13,000,000 |
-0- |
||
|
010. |
Property Acquisitions Pool--2024-2026 |
|||
|
Restricted Funds |
5,000,000 |
-0- |
||
|
Other Funds |
5,000,000 |
-0- |
||
|
TOTAL |
10,000,000 |
-0- |
||
|
011. |
Upgrade and Improve Residence Halls Pool--2024-2026 |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
012. |
Academic Computing Pool--2024-2026 |
|||
|
Restricted Funds |
8,000,000 |
-0- |
||
|
013. |
Scientific and Research Equipment Pool--2024-2026 |
|||
|
Restricted Funds |
3,000,000 |
-0- |
||
|
Federal Funds |
2,200,000 |
-0- |
||
|
Other Funds |
2,200,000 |
-0- |
||
|
TOTAL |
7,400,000 |
-0- |
||
|
014. |
Administrative Computing Pool--2024-2026 |
|||
|
Restricted Funds |
6,500,000 |
-0- |
||
|
015. |
Renovate/Repurpose Commonwealth Hall |
|||
|
Restricted Funds |
6,000,000 |
-0- |
||
|
016. |
Aviation Acquisition Pool--2024-2026 |
|||
|
Restricted Funds |
5,000,000 |
-0- |
||
|
017. |
Renovate Additional University Services Space |
|||
|
Restricted Funds |
2,000,000 |
-0- |
||
|
Other |
Funds 500,000 |
-0- |
||
|
TOTAL |
2,500,000 |
-0- |
||
|
018. |
Chemistry and Translational Research Pool--2024-2026 |
|||
|
Restricted Funds |
900,000 |
-0- |
||
|
Other Funds |
425,000 |
-0- |
||
|
TOTAL |
1,325,000 |
-0- |
||
|
019. |
Natural Areas Improvement Pool--2024-2026 |
|||
|
Restricted Funds |
1,000,000 |
-0- |
||
|
020. |
Asset Preservation Pool--2022-2024 Reauthorization ($8,222,000 Restricted Funds) |
|||
|
021. |
Guaranteed Energy Savings Performance Contracts |
|||
|
022. |
Lease--Aviation |
|||
|
023. |
Lease--New Housing Space |
|||
|
024. |
Lease--Madison County--Student Housing |
|||
|
025. |
Lease--Madison County--Land |
|||
|
026. |
Lease 1--Multi-Property--Multi-Use |
|||
|
027. |
Lease 2--Multi-Property--Multi-Use |
|||
|
4. |
KENTUCKY STATE UNIVERSITY |
|||
|
001. |
Asset Preservation Pool--2024-2026 |
|||
|
Bond Funds |
30,000,000 |
30,000,000 |
||
|
002. |
Design Health Sciences Center |
|||
|
Bond Funds |
-0- |
5,000,000 |
||
|
003. |
Acquire Land |
|||
|
Restricted Funds |
1,044,000 |
-0- |
||
|
Federal Funds |
1,044,000 |
-0- |
||
|
TOTAL |
2,088,000 |
-0- |
||
|
004. |
Asset Preservation Pool--2022-2024 Reauthorization ($2,412,000 Restricted Funds) |
|||
|
5. |
MOREHEAD STATE UNIVERSITY |
|||
|
001. |
Asset Preservation Pool--2024-2026 |
|||
|
Bond Funds |
18,835,000 |
18,835,000 |
||
|
002. |
Construct Multi-Disciplinary Classroom Building |
|||
|
Bond Funds |
90,000,000 |
-0- |
||
|
003. |
Construct New Residence Hall #1 |
|||
|
Agency Bonds |
49,800,000 |
-0- |
||
|
004. |
Construct New Residence Hall #2 |
|||
|
Agency Bonds |
40,350,000 |
-0- |
||
|
005. |
Capital Renewal and Maintenance Pool--Auxiliary Additional Reauthorization |
|||
|
($4,639,000 Agency Bonds) |
||||
|
Agency Bonds |
6,428,000 |
-0- |
||
|
006. |
Renovate Fields Residence Hall Additional Reauthorization ($4,920,000 Agency Bonds) |
|||
|
Agency Bonds |
4,124,000 |
-0- |
||
|
007. |
Renovate Grote-Thompson Residence Hall Additional Reauthorization ($4,920,000 |
|||
|
Agency Bonds) |
||||
|
Agency Bonds |
4,124,000 |
-0- |
||
|
008. |
Renovate and Replace Exterior Precast Panels--Nunn Hall Additional Reauthorization |
|||
|
($3,148,000 Agency Bonds) |
||||
|
Agency Bonds |
630,000 |
-0- |
||
|
009. |
Renovate Normal Residence Hall Additional Reauthorization ($3,840,000 Agency Bonds) |
|||
|
Agency Bonds |
580,000 |
-0- |
||
|
010. |
Comply with ADA--Auxiliary Reauthorization ($2,079,000 Agency Bonds) |
|||
|
011. |
Construct New Residence Hall Reauthorization ($38,792,000 Agency Bonds) |
|||
|
012. |
Guaranteed Energy Savings Performance Contracts |
|||
|
6. |
MURRAY STATE UNIVERSITY |
|||
|
001. |
Asset Preservation Pool--2024-2026 |
|||
|
Bond Funds |
23,341,000 |
23,341,000 |
||
|
002. |
Construct Learning Commons with Housing |
|||
|
Bond Funds |
38,000,000 |
-0- |
||
|
003. |
Athletic Facilities Improvement Pool--2024-2026 |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
Agency Bonds |
20,000,000 |
-0- |
||
|
TOTAL |
40,000,000 |
-0- |
||
|
004. |
Construct/Renovate Dining Facility |
|||
|
Restricted Funds |
30,000,000 |
-0- |
||
|
005. |
Replace College Courts Apartments |
|||
|
Agency Bonds |
15,000,000 |
-0- |
||
|
006. |
Asset Preservation Pool--Residence Halls |
|||
|
Agency Bonds |
6,000,000 |
-0- |
||
|
007. |
Enhance Dining Facility |
|||
|
Restricted Funds |
4,884,000 |
-0- |
||
|
008. |
Acquire Property |
|||
|
Restricted Funds |
4,180,000 |
-0- |
||
|
009. |
Construct New Auxiliary Services Building |
|||
|
Restricted Funds |
1,350,000 |
-0- |
||
|
Agency Bonds |
1,350,000 |
-0- |
||
|
TOTAL |
2,700,000 |
-0- |
||
|
010. |
Acquire Agriculture Research Farm Land |
|||
|
Restricted Funds |
1,254,000 |
-0- |
||
|
011. |
Acquire Nuclear Magnetic Resonance Equipment |
|||
|
Restricted Funds |
650,000 |
-0- |
||
|
012. |
Construct Residential Housing Reauthorization ($68,970,000 Agency Bonds) |
|||
|
013. |
Renovate Residence Hall Electrical System Reauthorization ($4,369,000 Agency Bonds) |
|||
|
014. |
Renovate Residence Hall HVAC System Reauthorization ($3,661,000 Agency Bonds) |
|||
|
015. |
Renovate Residence Hall Interior Reauthorization ($1,674,000 Agency Bonds) |
|||
|
016. |
Replace Residence Hall Domestic Water Piping Reauthorization ($1,195,000 Agency |
|||
|
Bonds) |
||||
|
017. |
Guaranteed Energy Savings Performance Contracts |
|||
|
7. |
NORTHERN KENTUCKY UNIVERSITY |
|||
|
001. |
Asset Preservation Pool--2024-2026 |
|||
|
Bond Funds |
23,076,000 |
23,076,000 |
||
|
002. |
Renew/Renovate Steely Library |
|||
|
Bond Funds |
49,000,000 |
-0- |
||
|
Other Funds |
3,000,000 |
-0- |
||
|
TOTAL |
52,000,000 |
-0- |
||
|
003. |
Enhance Online Programs |
|||
|
Bond Funds |
20,000,000 |
-0- |
||
|
004. |
Expand/Renovate Soccer Complex |
|||
|
Agency Bonds |
16,000,000 |
-0- |
||
|
Other Funds |
20,000,000 |
-0- |
||
|
TOTAL |
36,000,000 |
-0- |
||
|
005. |
Renovate/Expand Civic Center for Northern Kentucky Medical Examiner and Kentucky |
|||
|
State Police Crime Lab Relocation |
||||
|
Restricted Funds |
3,700,000 |
-0- |
||
|
Bond Funds |
17,300,000 |
-0- |
||
|
TOTAL |
21,000,000 |
-0- |
||
|
006. |
Renovate Nunn Hall Phase I |
|||
|
Other Funds |
4,500,000 |
-0- |
||
|
007. |
Replace Event Center Technology |
|||
|
Other Funds |
4,500,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
008. |
Renew/Repair Parking Garage Pool |
|||
|
Agency Bonds |
3,000,000 |
-0- |
||
|
009. |
Asset Preservation Pool--2022-2024 Reauthorization ($7,020,000 Restricted Funds) |
|||
|
010. |
Acquire Land/Master Plan 2010-2012 Reauthorization ($17,500,000 Agency Bonds, |
|||
|
$4,000,000 Restricted Funds, $4,000,000 Other Funds) |
||||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
011. |
Renovate Residence Halls Additional Reauthorization ($15,000,000 Agency Bonds) |
|||
|
012. |
Replace Recreation Field Turf Reauthorization ($2,000,000 Restricted Funds) |
|||
|
013. |
Expand Herrmann Science Center Additional Reauthorization ($79,900,000 Bond |
|||
|
Funds, $5,000,000 Other Funds) |
||||
|
014. |
Guaranteed Energy Savings Performance Contracts |
|||
|
8. |
UNIVERSITY OF KENTUCKY |
|||
|
(1) |
University of Kentucky Acquisitions: Notwithstanding any statute to the contrary, |
|||
|
the University of Kentucky or one of its affiliated corporations, for the benefit of the University's multifaceted education, healthcare, research, and service mission shall be permitted to assume any and all leases, debt instruments, and liabilities associated with the acquisition of St. Claire Medical Center, Inc, a nonprofit corporation duly organized and existing by virtue of the Laws of the Commonwealth of Kentucky with its principal place of business located at 222 Medical Circle, Morehead, Kentucky 40351. Assumption of leases and debt instruments shall be reported to the Capital Projects and Bond Oversight Committee. |
||||
|
001. |
Acquire/Partnership Academic/HealthCare Enterprise 1 (Restricted Funds) |
|||
|
002. |
Asset Preservation Pool--2024-2026 |
|||
|
Bond Funds |
61,725,000 |
61,725,000 |
||
|
Agency Bonds |
15,431,000 |
15,431,000 |
||
|
TOTAL |
77,156,000 |
77,156,000 |
||
|
003. |
Construct Agriculture Research Facility 1 |
|||
|
Restricted Funds |
30,000,000 |
-0- |
||
|
Bond Funds |
200,000,000 |
-0- |
||
|
TOTAL |
230,000,000 |
-0- |
||
|
004. |
Construct/Improve Medical/Administrative Facility 3 Additional Reauthorization |
|||
|
($200,000,000 Restricted Funds) |
||||
|
Restricted Funds |
1,000,000,000 |
-0- |
||
|
Agency Bonds |
800,000,000 |
-0- |
||
|
TOTAL |
1,800,000,000 |
-0- |
||
|
005. |
Construct/Improve Medical/Administrative Facility 6 |
|||
|
Restricted Funds |
300,000,000 |
-0- |
||
|
Other Funds |
300,000,000 |
-0- |
||
|
TOTAL |
600,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
006. |
Construct/Improve Medical/Administrative Facility 1 Additional Reauthorization |
|||
|
($250,000,000 Restricted Funds) |
||||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
Other Funds |
500,000,000 |
-0- |
||
|
TOTAL |
550,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
007. |
Construct Multi-Use Living Complex |
|||
|
Restricted Funds |
100,000,000 |
-0- |
||
|
Other Funds |
400,000,000 |
-0- |
||
|
TOTAL |
500,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
008. |
Acquire/Improve Medical/Administrative Facility 4 |
|||
|
Restricted Funds |
500,000,000 |
-0- |
||
|
009. |
Construct/Improve Medical/Administrative Facility 5 |
|||
|
Restricted Funds |
500,000,000 |
-0- |
||
|
010. |
Construct/Improve Medical/Administrative Facility 7 |
|||
|
Restricted Funds |
500,000,000 |
-0- |
||
|
011. |
Construct/Improve Medical/Administrative Facility 8 |
|||
|
Restricted Funds |
500,000,000 |
-0- |
||
|
012. |
Construct/Improve Medical/Administrative Facility 9 |
|||
|
Other Funds |
500,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
013. |
Construct/Improve Student Housing |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
Other Funds |
400,000,000 |
-0- |
||
|
TOTAL |
450,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
014. |
Improve Central Plants |
|||
|
Restricted Funds |
200,000,000 |
-0- |
||
|
Other Funds |
200,000,000 |
-0- |
||
|
TOTAL |
400,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
015. |
Acquire/Improve Medical/Administrative Facility 2 |
|||
|
Restricted Funds |
400,000,000 |
-0- |
||
|
016. |
Construct/Improve Medical/Administrative Facility 4 |
|||
|
Restricted Funds |
400,000,000 |
-0- |
||
|
017. |
Construct/Improve Utilities Infrastructure UK HealthCare |
|||
|
Restricted Funds |
200,000,000 |
-0- |
||
|
Other Funds |
200,000,000 |
-0- |
||
|
TOTAL |
400,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
018. |
Construct Utilities Infrastructure--Hamburg |
|||
|
Restricted Funds |
200,000,000 |
-0- |
||
|
Other Funds |
200,000,000 |
-0- |
||
|
TOTAL |
400,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
019. |
Construct Cancer/Ambulatory Facility Phase 2 |
|||
|
Restricted Funds |
350,000,000 |
-0- |
||
|
020. |
Acquire/Partnership Medical System 1 |
|||
|
Restricted Funds |
350,000,000 |
-0- |
||
|
021. |
Acquire/Partnership Medical System 2 |
|||
|
Restricted Funds |
350,000,000 |
-0- |
||
|
022. |
Construct/Improve Dining Facilities |
|||
|
Restricted Funds |
150,000,000 |
-0- |
||
|
Other Funds |
150,000,000 |
-0- |
||
|
TOTAL |
300,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
023. |
Acquire/Improve Medical/Administrative Facility 1 |
|||
|
Restricted Funds |
300,000,000 |
-0- |
||
|
024. |
Construct/Improve Medical/Administrative Facility 2 |
|||
|
Restricted Funds |
150,000,000 |
-0- |
||
|
Other Funds |
150,000,000 |
-0- |
||
|
TOTAL |
300,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
025. |
Improve UK HealthCare IT Systems |
|||
|
Restricted Funds |
300,000,000 |
-0- |
||
|
026. |
Construct/Improve Innovation Complex |
|||
|
Restricted Funds |
100,000,000 |
-0- |
||
|
Other Funds |
150,000,000 |
-0- |
||
|
TOTAL |
250,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
027. |
Construct/Improve Research Data Center |
|||
|
Restricted Funds |
240,000,000 |
-0- |
||
|
028. |
Construct/Improve Academic/Research Facility |
|||
|
Restricted Funds |
225,000,000 |
-0- |
||
|
029. |
Improve Campus Parking and Transportation System |
|||
|
Restricted Funds |
100,000,000 |
-0- |
||
|
Other Funds |
100,000,000 |
-0- |
||
|
TOTAL |
200,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
030. |
Implement Land Use Plan 1 |
|||
|
Restricted Funds |
200,000,000 |
-0- |
||
|
031. |
Improve Parking/Transportation Systems--UK HealthCare |
|||
|
Other Funds |
200,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
032. |
Construct Parking/Transportation System--Hamburg |
|||
|
Other Funds |
200,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
033. |
Improve Utilities Infrastructure--King's Daughters Medical Center |
|||
|
Restricted Funds |
100,000,000 |
-0- |
||
|
Other Funds |
100,000,000 |
-0- |
||
|
TOTAL |
200,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
034. |
Construct Digital Village Building 3 |
|||
|
Restricted Funds |
95,000,000 |
-0- |
||
|
Other Funds |
95,000,000 |
-0- |
||
|
TOTAL |
190,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
035. |
Construct Hotel/Conference Center |
|||
|
Other Funds |
150,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
036. |
Acquire E&G Enterprise 1 |
|||
|
Restricted Funds |
150,000,000 |
-0- |
||
|
037. |
Acquire E&G Enterprise 2 |
|||
|
Restricted Funds |
150,000,000 |
-0- |
||
|
038. |
Improve UK HealthCare Facilities--UK Chandler Hospital |
|||
|
Restricted Funds |
150,000,000 |
-0- |
||
|
039. |
Implement Land Use Plan 2 |
|||
|
Restricted Funds |
150,000,000 |
-0- |
||
|
040. |
Construct Academic Building |
|||
|
Restricted Funds |
149,000,000 |
-0- |
||
|
041. |
Construct/Improve Dental Sciences Building |
|||
|
Restricted Funds |
130,000,000 |
-0- |
||
|
042. |
Construct Agriculture Federal Research Facility I |
|||
|
Federal Funds |
108,000,000 |
-0- |
||
|
043. |
Acquire Land |
|||
|
Restricted Funds |
75,000,000 |
-0- |
||
|
Agency Bonds |
25,000,000 |
-0- |
||
|
TOTAL |
100,000,000 |
-0- |
||
|
044. |
Construct/Improve Research Space |
|||
|
Restricted Funds |
100,000,000 |
-0- |
||
|
045. |
Construct Retail/Parking Facility 2 |
|||
|
Other Funds |
100,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
046. |
Construct Retail/Parking Facility 1 |
|||
|
Other Funds |
100,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
047. |
Construct Medical Facility--King's Daughters Medical Center |
|||
|
Restricted Funds |
100,000,000 |
-0- |
||
|
048. |
Improve Medical Facility 1--King's Daughters Medical Center |
|||
|
Restricted Funds |
100,000,000 |
-0- |
||
|
049. |
Acquire/Improve Service Core Systems--King's Daughters Medical Center |
|||
|
Restricted Funds |
100,000,000 |
-0- |
||
|
050. |
Improve Building Systems--King's Daughters Medical Center |
|||
|
Restricted Funds |
100,000,000 |
-0- |
||
|
051. |
Improve Parking/Transportation Systems--King's Daughters Medical Center |
|||
|
Restricted Funds |
100,000,000 |
-0- |
||
|
052. |
Improve Site/Civil Infrastructure--King's Daughters Medical Center |
|||
|
Restricted Funds |
100,000,000 |
-0- |
||
|
053. |
Construct Equine/Horticulture Campus |
|||
|
Restricted Funds |
90,000,000 |
-0- |
||
|
054. |
Construct Meats/Food Development Center |
|||
|
Restricted Funds |
90,000,000 |
-0- |
||
|
055. |
Improve Funkhouser Building Additional Reauthorization ($15,000,000 Restricted |
|||
|
Funds, $15,000,000 Other Funds) |
||||
|
Restricted Funds |
90,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
056. |
Improve Chemistry/Physics Building Phase 3 |
|||
|
Restricted Funds |
88,000,000 |
-0- |
||
|
057. |
Improve White Hall Classroom Building |
|||
|
Restricted Funds |
83,000,000 |
-0- |
||
|
058. |
Improve Taylor Education Building |
|||
|
Restricted Funds |
80,000,000 |
-0- |
||
|
059. |
Improve King Library |
|||
|
Restricted Funds |
80,000,000 |
-0- |
||
|
060. |
Improve Fine Arts Building |
|||
|
Restricted Funds |
80,000,000 |
-0- |
||
|
061. |
Improve Singletary Center |
|||
|
Restricted Funds |
80,000,000 |
-0- |
||
|
062. |
Improve Johnson Center |
|||
|
Agency Bonds |
75,000,000 |
-0- |
||
|
063. |
Construct Agriculture Research Facility 2 |
|||
|
Restricted Funds |
75,000,000 |
-0- |
||
|
064. |
Construct Agriculture Research Facility 3 |
|||
|
Restricted Funds |
75,000,000 |
-0- |
||
|
065. |
Improve Center for Applied Energy Research (CAER) Facilities |
|||
|
Restricted Funds |
75,000,000 |
-0- |
||
|
066. |
Upgrade/Renovate/Expand Research Labs |
|||
|
Restricted Funds |
75,000,000 |
-0- |
||
|
067. |
Construct/Improve Parking I |
|||
|
Restricted Funds |
75,000,000 |
-0- |
||
|
068. |
Acquire/Improve Service Core Systems--UK HealthCare |
|||
|
Restricted Funds |
75,000,000 |
-0- |
||
|
069. |
Construct Service Core Systems--Hamburg |
|||
|
Restricted Funds |
75,000,000 |
-0- |
||
|
070. |
Improve Building Systems--UK HealthCare |
|||
|
Restricted Funds |
75,000,000 |
-0- |
||
|
071. |
Construct/Improve Greek Housing |
|||
|
Restricted Funds |
36,000,000 |
-0- |
||
|
Other Funds |
36,000,000 |
-0- |
||
|
TOTAL |
72,000,000 |
-0- |
||
|
072. |
Improve Scovell Hall |
|||
|
Restricted Funds |
70,000,000 |
-0- |
||
|
073. |
Construct Academic Facility |
|||
|
Restricted Funds |
68,000,000 |
-0- |
||
|
074. |
Construct Office Park at Coldstream |
|||
|
Other Funds |
65,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
075. |
Construct/Improve Research Administration Space |
|||
|
Restricted Funds |
60,000,000 |
-0- |
||
|
076. |
Improve Oswald Building |
|||
|
Restricted Funds |
60,000,000 |
-0- |
||
|
077. |
Construct/Improve Enterprise Data Center |
|||
|
Restricted Funds |
60,000,000 |
-0- |
||
|
078. |
Construct/Improve Athletics Facility 1 |
|||
|
Other Funds |
60,000,000 |
-0- |
||
|
079. |
Construct/Improve Office Building |
|||
|
Restricted Funds |
55,000,000 |
-0- |
||
|
080. |
Improve Kastle Hall |
|||
|
Restricted Funds |
54,000,000 |
-0- |
||
|
081. |
Construct Tennis Facility |
|||
|
Restricted Funds |
27,000,000 |
-0- |
||
|
Other Funds |
27,000,000 |
-0- |
||
|
TOTAL |
54,000,000 |
-0- |
||
|
082. |
Improve Campus Core Quadrangle Facilities |
|||
|
Restrictd Funds |
54,000,000 |
-0- |
||
|
083. |
Construct/Relocate/Replace Greenhouses |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
084. |
Purchase/Construct CO2 Capture Process Plant |
|||
|
Restricted Funds |
1,500,000 |
-0- |
||
|
Federal Funds |
40,000,000 |
-0- |
||
|
Other Funds |
8,500,000 |
-0- |
||
|
TOTAL |
50,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
085. |
Improve Health Sciences Research Building |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
086. |
Improve Angliana Facilities |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
087. |
Construct/Improve Parking II |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
088. |
Improve Coldstream Research Campus |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
089. |
Improve Site/Civil Infrastructure |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
090. |
Decommission Facilities |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
091. |
Construct West End Zone Club Space |
|||
|
Other Funds |
50,000,000 |
-0- |
||
|
092. |
Improve Clinical/Ambulatory Services Facilities |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
093. |
Improve State Street Medical Facilities |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
094. |
Construct/Improve Ambulatory Care |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
095. |
Construct Building Systems--Hamburg |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
096. |
Improve Site/Civil Infrastructure--UK HealthCare |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
097. |
Construct Site/Civil Infrastructure--Hamburg |
|||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
098. |
Construct Health Education Building Additional Reauthorization ($250,000,000 Bond |
|||
|
Funds, $50,000,000 Agency Bonds, $50,000,000 Other Funds, $30,000,000 Restricted Funds) |
||||
|
Restricted Funds |
50,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
099. |
Improve Jacobs Science Building |
|||
|
Restricted Funds |
48,000,000 |
-0- |
||
|
100. |
Improve McVey Hall |
|||
|
Restricted Funds |
48,000,000 |
-0- |
||
|
101. |
Construct/Improve Wildcat Coal Lodge |
|||
|
Other Funds |
48,000,000 |
-0- |
||
|
102. |
Improve Memorial Hall |
|||
|
Restricted Funds |
45,000,000 |
-0- |
||
|
103. |
Construct/Improve Library Depository Facility |
|||
|
Restricted Funds |
45,000,000 |
-0- |
||
|
104. |
Improve Willard Medical Education/Science Building |
|||
|
Restricted Funds |
40,000,000 |
-0- |
||
|
105. |
Construct/Improve Student Success/Academic Facility |
|||
|
Restricted Funds |
40,000,000 |
-0- |
||
|
106. |
Improve Building Shell Systems |
|||
|
Restricted Funds |
40,000,000 |
-0- |
||
|
107. |
Improve Markey Cancer Center Facilities |
|||
|
Restricted Funds |
40,000,000 |
-0- |
||
|
108. |
Construct Teaching Pavilion |
|||
|
Restricted Funds |
38,000,000 |
-0- |
||
|
109. |
Construct Police Headquarters |
|||
|
Restricted Funds |
35,000,000 |
-0- |
||
|
110. |
Construct Support Services Building |
|||
|
Restricted Funds |
35,000,000 |
-0- |
||
|
111. |
Construct/Improve Recreation Quad 1 |
|||
|
Restricted Funds |
35,000,000 |
-0- |
||
|
112. |
Improve Building Mechanical Systems |
|||
|
Restricted Funds |
35,000,000 |
-0- |
||
|
113. |
Improve Moloney Building |
|||
|
Restricted Funds |
35,000,000 |
-0- |
||
|
114. |
Improve Pence Hall |
|||
|
Restricted Funds |
32,000,000 |
-0- |
||
|
115. |
Improve Seaton Center |
|||
|
Restricted Funds |
30,000,000 |
-0- |
||
|
116. |
Improve Student Services Space II |
|||
|
Restricted Funds |
30,000,000 |
-0- |
||
|
117. |
Research Equipment Pool--2024-2026 |
|||
|
Restricted Funds |
30,000,000 |
-0- |
||
|
118. |
Construct/Improve Alumni Center |
|||
|
Restricted Funds |
15,000,000 |
-0- |
||
|
Other Funds |
15,000,000 |
-0- |
||
|
TOTAL |
30,000,000 |
-0- |
||
|
119. |
Improve Parking Garage 1 |
|||
|
Restricted Funds |
30,000,000 |
-0- |
||
|
120. |
Improve Parking Garage 2 |
|||
|
Restricted Funds |
30,000,000 |
-0- |
||
|
121. |
Improve UK Good Samaritan Hospital Facilities |
|||
|
Restricted Funds |
30,000,000 |
-0- |
||
|
122. |
Construct/Improve Patient Support Facility |
|||
|
Restricted Funds |
30,000,000 |
-0- |
||
|
123. |
Improve Medical Facility 2--King's Daughters Medical Center |
|||
|
Restricted Funds |
30,000,000 |
-0- |
||
|
124. |
Improve Medical Facility 7--King's Daughters Medical Center |
|||
|
Restricted Funds |
30,000,000 |
-0- |
||
|
125. |
Improve Electrical Infrastructure |
|||
|
Restricted Funds |
28,000,000 |
-0- |
||
|
126. |
Improve Lexington Theological Seminary (LTS) Facilities |
|||
|
Restricted Funds |
27,000,000 |
-0- |
||
|
127. |
Improve Library Facility |
|||
|
Restricted Funds |
27,000,000 |
-0- |
||
|
128. |
Improve Mechanical Infrastructure |
|||
|
Restricted Funds |
26,000,000 |
-0- |
||
|
129. |
Improve Academic and Tech Science Building |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
130. |
Improve W.T. Young Facility |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
131. |
Improve Barnhart Building |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
132. |
Construct/Improve Transformative Learning Center |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
133. |
Improve Life Safety |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
134. |
Construct Childcare Center Facility |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
135. |
Improve Student Center Space 2 |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
136. |
Improve Student Center Space 3 |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
137. |
Repair Critical Infrastructure/Building Systems |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
138. |
Improve Medical Facility 3 |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
139. |
Improve Medical Facility 4 |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
140. |
Improve Medical Facility 5 |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
141. |
Improve Medical Facility 6 |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
142. |
Improve Medical Facility 7 |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
143. |
Implement Patient Communication System |
|||
|
Restricted Funds |
25,000,000 |
-0- |
||
|
144. |
Construct/Improve Machine Lab |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
145. |
Acquire/Improve Service Core Systems |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
146. |
Improve Academic Facility 1 |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
147. |
Improve Academic/Administrative Space 1 |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
148. |
Improve Academic/Administrative Space 2 |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
149. |
Improve Academic/Administrative Space 3 |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
150. |
Improve Academic/Administrative Space 4 |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
151. |
Lease/Purchase Enterprise IT Systems |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
152. |
Improve Athletics Facility 1 |
|||
|
Other Funds |
20,000,000 |
-0- |
||
|
153. |
Construct UK HealthCare Medical Transport Facility |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
154. |
Improve Medical Facility 3--King's Daughters Medical Center |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
155. |
Improve Medical Facility 4--King's Daughters Medical Center |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
156. |
Improve Medical Facility 5--King's Daughters Medical Center |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
157. |
Improve Medical Facility 6--King's Daughters Medical Center |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
158. |
Improve Medical Facility 8--King's Daughters Medical Center |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
159. |
Improve Medical Facility 9--King's Daughters Medical Center |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
160. |
Improve Medical Facility 10--King's Daughters Medical Center |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
161. |
Construct/Improve King's Daughters Medical Center Medical Transport Facility |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
162. |
Improve King's Daughters Medical Center Medical Pavilion |
|||
|
Restricted Funds |
20,000,000 |
-0- |
||
|
163. |
Improve Hilary J. Boone Center |
|||
|
Restricted Funds |
18,000,000 |
-0- |
||
|
164. |
Improve Medical Center Library |
|||
|
Restricted Funds |
17,000,000 |
-0- |
||
|
165. |
Improve Lancaster Aquatic Center 1 |
|||
|
Other Funds |
17,000,000 |
-0- |
||
|
166. |
Improve Multi-Disciplinary Science Building |
|||
|
Restricted Funds |
15,000,000 |
-0- |
||
|
167. |
Improve Student Services Space III |
|||
|
Restricted Funds |
15,000,000 |
-0- |
||
|
168. |
Construct/Fit-up Retail Space |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
Other Funds |
5,000,000 |
-0- |
||
|
TOTAL |
15,000,000 |
-0- |
||
|
169. |
Improve Spindletop Hall Facilities |
|||
|
Restricted Funds |
15,000,000 |
-0- |
||
|
170. |
Construct/Improve Athletics Facility 2 |
|||
|
Other Funds |
15,000,000 |
-0- |
||
|
171. |
Improve Athletics Facility 2 |
|||
|
Other Funds |
15,000,000 |
-0- |
||
|
172. |
Improve Kroger Field 1 |
|||
|
Other Funds |
15,000,000 |
-0- |
||
|
173. |
Improve Boone Tennis Center |
|||
|
Other Funds |
15,000,000 |
-0- |
||
|
174. |
Acquire Data Center Hardware |
|||
|
Restricted Funds |
15,000,000 |
-0- |
||
|
175. |
Construct Metal Arts/Digital Media Building |
|||
|
Restricted Funds |
14,000,000 |
-0- |
||
|
176. |
Improve Gray Design Building |
|||
|
Restricted Funds |
14,000,000 |
-0- |
||
|
177. |
Improve CAFE Motor Pool Building |
|||
|
Restricted Funds |
14,000,000 |
-0- |
||
|
178. |
Construct Agriculture Federal Research Facility II |
|||
|
Federal Funds |
14,000,000 |
-0- |
||
|
179. |
Improve Peterson Service Building |
|||
|
Restricted Funds |
14,000,000 |
-0- |
||
|
180. |
Improve Baseball Facility Phase II |
|||
|
Other Funds |
14,000,000 |
-0- |
||
|
181. |
Improve Patterson Office Tower |
|||
|
Restricted Funds |
12,000,000 |
-0- |
||
|
182. |
Improve University Storage Facility |
|||
|
Restricted Funds |
12,000,000 |
-0- |
||
|
183. |
Acquire/Improve Clinical/Research Facility |
|||
|
Restricted Funds |
11,000,000 |
-0- |
||
|
184. |
Improve Campus Infrastructure |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
185. |
Improve DLAR Facilities |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
186. |
ADA Compliance Pool--2024-2026 |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
187. |
Acquire/Improve Administrative Facility |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
188. |
Improve Building Electrical Systems |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
189. |
Improve Senior Center |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
190. |
Improve Fume Hood Systems |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
191. |
Improve Vaughan Facility |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
192. |
Expand Arboretum Visitor Center |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
193. |
Lease/Purchase Enterprise Network Security |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
194. |
Lease/Purchase High Performance Computer |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
195. |
Lease/Purchase Campus IT System |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
196. |
Improve Memorial Coliseum |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
197. |
Acquire Equipment/Furnishings Pool--2024-2026 |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
198. |
Construct/Improve Gymnastics Practice Facility |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
199. |
Improve Athletics Facility 3 |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
200. |
Improve Lancaster Aquatic Center 2 |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
201. |
Acquire Telemedicine/Virtual ICU |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
202. |
Renovate/Improve Nursing Units |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
203. |
Improve Administrative/Medical Facility--King's Daughters Medical Center |
|||
|
Restricted Funds |
10,000,000 |
-0- |
||
|
204. |
Improve Anderson Tower |
|||
|
Restricted Funds |
9,000,000 |
-0- |
||
|
205. |
Improve Mineral Industries Building |
|||
|
Restricted Funds |
9,000,000 |
-0- |
||
|
206. |
Renovate Carnahan House |
|||
|
Restricted Funds |
8,000,000 |
-0- |
||
|
207. |
Acquire/Improve Golf Facility |
|||
|
Other Funds |
8,000,000 |
-0- |
||
|
208. |
Improve Kroger Field 2 |
|||
|
Other Funds |
8,000,000 |
-0- |
||
|
209. |
Improve Whalen Building and Bay Facility--Kentucky Advanced Manufacturing |
|||
|
Restricted Funds |
7,000,000 |
-0- |
||
|
210. |
Improve Medical Plaza |
|||
|
Restricted Funds |
7,000,000 |
-0- |
||
|
211. |
Renovate Space for a Testing Center |
|||
|
Restricted Funds |
7,000,000 |
-0- |
||
|
212. |
Improve Nursing Building |
|||
|
Restricted Funds |
7,000,000 |
-0- |
||
|
213. |
Improve Enterprise Networking 1 |
|||
|
Restricted Funds |
7,000,000 |
-0- |
||
|
214. |
Improve Enterprise Networking 2 |
|||
|
Restricted Funds |
7,000,000 |
-0- |
||
|
215. |
Lease/Purchase Enterprise Infrastructure |
|||
|
Restricted Funds |
7,000,000 |
-0- |
||
|
216. |
Improve Nutter Training Facility |
|||
|
Other Funds |
7,000,000 |
-0- |
||
|
217. |
Improve Soccer/Softball Facility |
|||
|
Other Funds |
7,000,000 |
-0- |
||
|
218. |
Improve Cooper House |
|||
|
Restricted Funds |
6,000,000 |
-0- |
||
|
219. |
Expand KGS Well Sample and Core Repository |
|||
|
Restricted Funds |
6,000,000 |
-0- |
||
|
220. |
Improve Parking Structure 2 Enterprise Data Center |
|||
|
Restricted Funds |
6,000,000 |
-0- |
||
|
221. |
Improve Athletics Facility 4 |
|||
|
Other Funds |
6,000,000 |
-0- |
||
|
222. |
Improve Athletics Facility 5 |
|||
|
Other Funds |
6,000,000 |
-0- |
||
|
223. |
Improve Joe Craft Center |
|||
|
Other Funds |
6,000,000 |
-0- |
||
|
224. |
Improve Student Services Space I |
|||
|
Restricted Funds |
5,000,000 |
-0- |
||
|
225. |
Improve Counseling Center Space |
|||
|
Restricted Funds |
5,000,000 |
-0- |
||
|
226. |
Improve Enterprise Cable Infrastructure |
|||
|
Restricted Funds |
5,000,000 |
-0- |
||
|
227. |
Lease/Purchase Enterprise Call Center System |
|||
|
Restricted Funds |
5,000,000 |
-0- |
||
|
228. |
Lease/Purchase Enterprise Voice Infrastructure |
|||
|
Restricted Funds |
5,000,000 |
-0- |
||
|
229. |
Acquire Information Technology Systems |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
230. |
Construct Athletics Hall of Fame Plaza |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
231. |
Improve Sturgill Development Building |
|||
|
Restricted Funds |
4,000,000 |
-0- |
||
|
232. |
Acquire Transportation Buses |
|||
|
Restricted Funds |
3,000,000 |
-0- |
||
|
233. |
Improve Indoor/Outdoor Track |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
234. |
Construct Cross Country Trail |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
235. |
Construct/Improve Athletics Surfaces 1 |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
236. |
Construct/Improve Athletics Surfaces 2 |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
237. |
Improve Joe Craft Football Practice Facility |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
238. |
Replace Basketball Playing Floors |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
239. |
Construct/Improve Athletics Surfaces 3 |
|||
|
Other Funds |
2,000,000 |
-0- |
||
|
240. |
Facilities Renewal and Modernization 1 Reauthorization ($125,000,000 Restricted |
|||
|
Funds) |
||||
|
241. |
Lease--Off-Campus 1--Fayette Co. |
|||
|
242. |
Lease--Off-Campus 3 |
|||
|
243. |
Lease--Off-Campus 4 |
|||
|
244. |
Lease--Off-Campus 6 |
|||
|
245. |
Lease--Off-Campus 7 |
|||
|
246. |
Lease--Off-Campus 12 |
|||
|
247. |
Lease--Off-Campus 13 |
|||
|
248. |
Lease--Off-Campus 14 |
|||
|
249. |
Lease--Off-Campus 15 |
|||
|
250. |
Lease--Off-Campus 16 |
|||
|
251. |
Lease--Off-Campus 17 |
|||
|
252. |
Lease--Off-Campus 18 |
|||
|
253. |
Lease--Off-Campus 19 |
|||
|
254. |
Lease--Off-Campus 20 |
|||
|
255. |
Lease--Off-Campus 21 |
|||
|
256. |
Lease--Off-Campus 22 |
|||
|
257. |
Lease--Off-Campus Housing 1 |
|||
|
258. |
Lease--Off-Campus Housing 2 |
|||
|
259. |
Lease--Health Science Colleges 1 |
|||
|
260. |
Lease--Health Science Colleges 2 |
|||
|
261. |
Lease--Health Science College 3 |
|||
|
262. |
Lease--Off-Campus Athletics 1 |
|||
|
263. |
Lease--Off-Campus Athletics 2 |
|||
|
264. |
Lease--Health Affairs Office 1 |
|||
|
265. |
Lease--Health Affairs Office 3 |
|||
|
266. |
Lease--Health Affairs Office 5 |
|||
|
267. |
Lease--Health Affairs Office 11 |
|||
|
268. |
Lease--Health Affairs Office 12 |
|||
|
269. |
Lease--Health Affairs Office 14 |
|||
|
270. |
Lease--Health Affairs Office 15 |
|||
|
271. |
Lease--Health Affairs Office 18 |
|||
|
272. |
Lease--Health Affairs Office 19 |
|||
|
273. |
Lease--Lease Health Affairs 20 |
|||
|
274. |
Lease--UK HealthCare Off-Campus Facility 2 |
|||
|
275. |
Lease--UK HealthCare Off-Campus Facility 3 |
|||
|
276. |
Lease--UK HealthCare Off-Campus Facility 12 |
|||
|
277. |
Lease--UK HealthCare Off-Campus Facility 13 |
|||
|
278. |
Lease--UK HealthCare Off-Campus Facility 14 |
|||
|
279. |
Lease--UK HealthCare Off-Campus Facility 15 |
|||
|
280. |
Lease--UK HealthCare Off-Campus Facility 16 |
|||
|
281. |
Lease--UK HealthCare Off-Campus Facility 17 |
|||
|
282. |
Lease--UK HealthCare Off-Campus Facility 18 |
|||
|
283. |
Lease--UK HealthCare Off-Campus Facility 19 |
|||
|
284. |
Lease--UK HealthCare Off-Campus Facility 20 |
|||
|
285. |
Lease--UK HealthCare Off-Campus Facility 21 |
|||
|
286. |
Lease--UK HealthCare Off-Campus Facility 22 |
|||
|
287. |
Lease--UK HealthCare Off-Campus Facility 23 |
|||
|
288. |
Lease--UK HealthCare Off-Campus Facility 24 |
|||
|
289. |
Lease--UK HealthCare Off-Campus Facility 25 |
|||
|
290. |
Lease--UK HealthCare Off-Campus Facility 26 |
|||
|
291. |
Lease--UK HealthCare Off-Campus Facility 27 |
|||
|
292. |
Lease--UK HealthCare Off-Campus Facility 28 |
|||
|
293. |
Lease--UK HealthCare Off-Campus Facility 29 |
|||
|
294. |
Lease--UK HealthCare Off-Campus Facility 30 |
|||
|
295. |
Lease--UK HealthCare Off-Campus Facility 31 |
|||
|
296. |
Lease--UK HealthCare Off-Campus Facility 32 |
|||
|
297. |
Lease--UK HealthCare Off-Campus 33 |
|||
|
298. |
Lease--UK HealthCare Off-Campus 34 |
|||
|
299. |
Lease--Off-Campus 2 |
|||
|
300. |
Lease--Off-Campus 11 |
|||
|
301. |
Lease--College of Medicine 1 |
|||
|
302. |
Lease--College of Medicine 2 |
|||
|
303. |
Lease--Health Affairs Office 2 |
|||
|
304. |
Lease--Health Affairs Office 4 |
|||
|
305. |
Lease--Health Affairs Office 6 |
|||
|
306. |
Lease--Health Affairs Office 7 |
|||
|
307. |
Lease--Health Affairs Office 8 |
|||
|
308. |
Lease--Health Affairs Office 9 |
|||
|
309. |
Lease--Health Affairs Office 10 |
|||
|
310. |
Lease--Health Affairs Office 13 |
|||
|
311. |
Lease--Health Affairs Office 16 |
|||
|
312. |
Lease--Health Affairs Office 17 |
|||
|
313. |
Lease--Good Samaritan--UK Healthcare |
|||
|
314. |
Lease--UK HealthCare Off-Campus Facility 1 |
|||
|
315. |
Lease--UK HealthCare Off-Campus Facility 4 |
|||
|
316. |
Lease--UK HealthCare Off-Campus Facility 5 |
|||
|
317. |
Lease--UK HealthCare Off-Campus Facility 6 |
|||
|
318. |
Lease--UK HealthCare Off-Campus Facility 7 |
|||
|
319. |
Lease--UK HealthCare Off-Campus Facility 8 |
|||
|
320. |
Lease--UK HealthCare Off-Campus Facility 9 |
|||
|
321. |
Lease--UK HealthCare Off-Campus Facility 10 |
|||
|
322. |
Lease--UK HealthCare Off-Campus Facility 11 |
|||
|
323. |
Lease--Off-Campus 8 |
|||
|
324. |
Lease--Off-Campus 9 |
|||
|
325. |
Lease--Off-Campus 10 |
|||
|
326. |
Lease--UK HealthCare Royal Blue Health 1 |
|||
|
327. |
Lease--UK HealthCare Royal Blue Health 2 |
|||
|
328. |
Lease--UK HealthCare Royal Blue Health 3 |
|||
|
329. |
Lease--UK HealthCare Royal Blue Health 4 |
|||
|
330. |
Lease--UK HealthCare Royal Blue Health 5 |
|||
|
331. |
Lease--UK HealthCare Royal Blue Health 6 |
|||
|
332. |
Lease--UK HealthCare Royal Blue Health 7 |
|||
|
333. |
Lease--UK HealthCare Royal Blue Health 8 |
|||
|
334. |
Guaranteed Energy Savings Performance Contracts |
|||
|
335. |
Guaranteed Energy Savings Performance Contracts UK Healthcare |
|||
|
9. |
UNIVERSITY OF LOUISVILLE |
|||
|
001. |
Asset Preservation Pool--2024-2026 |
|||
|
Bond Funds |
34,553,000 |
34,553,000 |
||
|
Agency Bonds |
8,638,000 |
8,638,000 |
||
|
TOTAL |
43,191,000 |
43,191,000 |
||
|
002. |
Construct Health Sciences Simulation Center and Collaboration Hub |
|||
|
Bond Funds |
260,000,000 |
-0- |
||
|
Agency Bonds |
20,000,000 |
-0- |
||
|
TOTAL |
280,000,000 |
-0- |
||
|
003. |
Construct Athletics Village |
|||
|
Other Funds |
150,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
004. |
Construct STEM Building |
|||
|
Other Funds |
142,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
005. |
Modernize Campus Infrastructure |
|||
|
Other Funds |
100,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
006. |
Construct P3 Housing Complex |
|||
|
Other Funds |
80,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45A.077. |
|||
|
007. |
Construct Resident Hall |
|||
|
Agency Bonds |
80,000,000 |
-0- |
||
|
008. |
Purchase Residence Housing Facility |
|||
|
Other Funds |
75,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
009. |
Arts and Sciences Reinvention |
|||
|
Other Funds |
70,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
010. |
Construct Natatorium |
|||
|
Other Funds |
60,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
011. |
Guaranteed Energy Savings Contract |
|||
|
Agency Bonds |
50,000,000 |
-0- |
||
|
012. |
Structural Improvement Pool--2024-2026 |
|||
|
Other Funds |
40,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
013. |
Modernize Steam and Chill Water Plant |
|||
|
Agency Bonds |
40,000,000 |
-0- |
||
|
014. |
Replace Building Mechanical/Electrical/Plumbing |
|||
|
Other Funds |
25,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
015. |
Expand Basketball/Lacrosse Practice Facility |
|||
|
Other Funds |
25,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
016. |
Renovate Cardinal Football Stadium |
|||
|
Other Funds |
25,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
017. |
Renovate Exterior Envelope Replacement-55A |
|||
|
Agency Bonds |
20,000,000 |
-0- |
||
|
018. |
Vivarium Equipment Replacement and Upgrade Pool--2024-2026 |
|||
|
Other Funds |
20,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
019. |
Expand Patterson Stadium/Construct Indoor Facility |
|||
|
Other Funds |
20,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
020. |
Construct Indoor Facility |
|||
|
Other Funds |
20,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
021. |
Purchase Next Generation/Enterprise Resource Planning Support System |
|||
|
Other Funds |
20,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
022. |
Construct Student Commons and Recreational Fields |
|||
|
Agency Bonds |
17,000,000 |
-0- |
||
|
023. |
Renovate School of Nursing |
|||
|
Other Funds |
17,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
024. |
Frazier Rehabilitation, Renovation, Build-Out and Equip |
|||
|
Other Funds |
16,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
025. |
Renovate College of Business Academic Space |
|||
|
Agency Bonds |
15,000,000 |
-0- |
||
|
026. |
Improve Housing Facilities Pool |
|||
|
Other Funds |
15,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
027. |
Purchase Land |
|||
|
Agency Bonds |
15,000,000 |
-0- |
||
|
028. |
Expand Ulmer Softball Stadium/Construct Indoor Facility |
|||
|
Other Funds |
15,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
029. |
Speed School Multidisciplinary Engineering Building 1--Speed School Addition |
|||
|
Reauthorization ($65,000,000 Bond Funds, $10,000,000 Restricted Funds) |
||||
|
Agency Bonds |
15,000,000 |
-0- |
||
|
030. |
Campus Code Improvement Pool--2024-2026 |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
031. |
Purchase Content Management System |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
032. |
Construct Connector Speed School to Research Park |
|||
|
Agency Bonds |
10,000,000 |
-0- |
||
|
033. |
Replace Electronic Video Boards |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
034. |
Expand and Renovate Marshall Center Complex |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
035. |
Renovate Cardinal Park |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
036. |
Capital Renewal for Athletic Venues |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
037. |
Expand and Renovate Wright Natatorium |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
038. |
Replace Cardinal Stadium Seats |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
039. |
Update and Replace Technology in Athletic Venues |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
040. |
Renovate L&N Arena |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
041. |
Purchase Networking System |
|||
|
Other Funds |
8,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
042. |
Construct Athletics Office Building |
|||
|
Other Funds |
7,500,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
043. |
Renovate Cardinal Stadium Club Upgrades |
|||
|
Other Funds |
7,500,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
044. |
Purchase Computing for Research Infrastructure |
|||
|
Other Funds |
7,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
045. |
Replace Seats in Athletic Venues |
|||
|
Other Funds |
7,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to o KRS 45.763. |
|||
|
046. |
Demolish Resident Halls |
|||
|
Other Funds |
6,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
047. |
Renovate and Update Student/Athlete Dormitory |
|||
|
Other Funds |
6,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
048. |
Purchase Security and Firewall Infrastructure |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
049. |
ADA Building Upgrade Pool--2024-2026 |
|||
|
Agency Bonds |
3,000,000 |
-0- |
||
|
Other Funds |
2,000,000 |
-0- |
||
|
TOTAL |
5,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
050. |
Construct Athletic Grounds Building |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
051. |
Construct Football Practice Field Lighting |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
052. |
Renovate Bass Rudd Tennis Center |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
053. |
Renovate Lynn Soccer Stadium |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
054. |
Renovate Thornton's Academic Center |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
055. |
Renovate Trager Football Practice Facility |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
056. |
Renovate Patterson Baseball Stadium |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
057. |
Construct Practice Bubble |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
058. |
Demolish and Construct Golf Maintenance/Chemical Building |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
059. |
Expand and Renovate Athletic Parking Lots |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
060. |
Expand and Renovate Tailgate Space |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
061. |
Renovate Garvin Brown Boathouse |
|||
|
Other Funds |
4,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
062. |
Renovate and Expand ACC Network Studio |
|||
|
Other Funds |
4,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
063. |
Update and Replace Equipment in ACCN Studio |
|||
|
Other Funds |
4,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
064. |
Renovate Parking Structures |
|||
|
Other Funds |
3,600,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
065. |
Purchase Fiber Infrastructure |
|||
|
Other Funds |
3,500,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
066. |
Purchase Computer Processing System and Storage |
|||
|
Other Funds |
3,500,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
067. |
Renovate College of Education Academic Space Pool--2024-2026 |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
068. |
Renovate Gross Anatomy Lab |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
069. |
Renovate Golf Club--Shelby County |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
070. |
Renovate and Expand Lee Street Facility |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
071. |
Replace Fiber Pathway from ACC Studio to Venues |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
072. |
Expand, Replace and Maintain Grass Practice Fields |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
073. |
Renovate Miller IT Building |
|||
|
Other Funds |
2,500,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
074. |
Construct Belknap Stormwater Mitigation Improvements |
|||
|
Other Funds |
2,500,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
075. |
Renovate Resurface and Repair Parking Lot |
|||
|
Other Funds |
2,500,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
076. |
Construct Belknap 3rd Street Improvements |
|||
|
Restricted Funds |
2,500,000 |
-0- |
||
|
077. |
Construct Belknap Stormwater Mitigation Improvement |
|||
|
Other Funds |
2,500,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
078. |
Update Green Health Sciences Campus Courtyard |
|||
|
Other Funds |
2,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
079. |
Build Out Space for UofL Departments in P3 building |
|||
|
Other Funds |
2,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
080. |
Renovate Dental School Space |
|||
|
Other Funds |
2,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
081. |
Workday Enhancements--Post Implementation |
|||
|
Other Funds |
2,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
082. |
Replace Artificial Turf Field IV |
|||
|
Other Funds |
2,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
083. |
Replace Artificial Turf Field V |
|||
|
Other Funds |
2,000,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
084. |
Renovate Interfaith Center |
|||
|
Other Funds |
1,500,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
085. |
Upgrade Plumbing and Sanitary Lines Dental School |
|||
|
Other Funds |
1,200,000 |
-0- |
||
|
(1) |
Authorization: The above authorization is approved pursuant to KRS 45.763. |
|||
|
086. |
Asset Preservation Pool--2022-2024 Reauthorization ($24,566,000 Restricted Funds) |
|||
|
087. |
Lease--Medical Center One |
|||
|
088. |
Lease--Kidney Dialysis Center |
|||
|
089. |
Lease--Nucleus 1 Building |
|||
|
090. |
Lease--University Pointe |
|||
|
091. |
Lease--Cardinal Towne |
|||
|
092. |
Lease--Province Apartments |
|||
|
093. |
Lease--Trager Institute |
|||
|
094. |
Lease--1212 S. 4th St, Louisville, KY |
|||
|
095. |
Lease--Liberty Green Community Center |
|||
|
096. |
Lease--Western Kentucky Community and Technical College |
|||
|
097. |
Lease--Denny Crum Hall |
|||
|
098. |
Lease--Soccer Stadium |
|||
|
099. |
Lease--Founders Square |
|||
|
100. |
Lease--Cardinal Station--Human Resources and Risk Management |
|||
|
101. |
Lease--Rowan Building--A&S Fine Arts |
|||
|
102. |
Lease--Academic Space 1 |
|||
|
103. |
Lease--Academic Space 2 |
|||
|
104. |
Lease--Arthur Street--Tafel Building |
|||
|
105. |
Lease--Athletic/Student Dormitory |
|||
|
106. |
Lease--Housing Facilities |
|||
|
107. |
Lease--Housing 1 |
|||
|
108. |
Lease--Housing 2 |
|||
|
109. |
Lease--Housing 3 |
|||
|
110. |
Lease--Housing 4 |
|||
|
111. |
Lease--Jefferson County Clinic Space--State of Kentucky |
|||
|
112. |
Lease--Jefferson County Clinic Space 1 |
|||
|
113. |
Lease--Jefferson County Clinic Space 2 |
|||
|
114. |
Lease--Jefferson County Clinic Space 3 |
|||
|
115. |
Lease--Jefferson County--Office Space 1 |
|||
|
116. |
Lease--Jefferson County--Office Space 2 |
|||
|
117. |
Lease--Jefferson County--Office Space 3 |
|||
|
118. |
Lease--Jefferson County--Office Space 4 |
|||
|
119. |
Lease--Medical Center One 2 |
|||
|
120. |
Lease--Nucleus 1 Building 2 |
|||
|
121. |
Lease--Support Space 1 |
|||
|
122. |
Lease--Cardinal Station--Development Office |
|||
|
10. |
WESTERN KENTUCKY UNIVERSITY |
|||
|
001. |
Asset Preservation Pool--2024-2026 |
|||
|
Bond Funds |
28,581,000 |
28,581,000 |
||
|
002. |
Replace Academic Complex |
|||
|
Bond Funds |
160,000,000 |
-0- |
||
|
003. |
Renovate Center for Research and Development Phase I |
|||
|
Restricted Funds |
6,000,000 |
-0- |
||
|
Other Funds |
6,000,000 |
-0- |
||
|
TOTAL |
12,000,000 |
-0- |
||
|
004. |
Reauthorize WKU Asset Preservation Restricted Match |
|||
|
Restricted Funds |
10,212,000 |
-0- |
||
|
005. |
Construct Parking Structure IV Additional Reauthorization ($25,000,000 Agency Bonds) |
|||
|
Agency Bonds |
10,000,000 |
-0- |
||
|
006. |
Renovate and Expand Clinical Education Complex |
|||
|
Other Funds |
10,000,000 |
-0- |
||
|
007. |
Expand Track and Field Facilities |
|||
|
Other Funds |
6,500,000 |
-0- |
||
|
008. |
Renovate South Campus |
|||
|
Restricted Funds |
6,000,000 |
-0- |
||
|
009. |
Construct Baseball Grandstand |
|||
|
Other Funds |
6,000,000 |
-0- |
||
|
010. |
Renovate/Expand Cliff Todd Center |
|||
|
Agency Bonds |
6,000,000 |
-0- |
||
|
011. |
Construct Football Press Box |
|||
|
Other Funds |
6,000,000 |
-0- |
||
|
012. |
Acquire Furniture, Fixtures, and Equipment Diddle Arena |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
013. |
Acquire Furniture Fixtures & Equipment Pool |
|||
|
Restricted Funds |
5,000,000 |
-0- |
||
|
014. |
Remove and Replace Student Housing at Farm |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
015. |
Add Club Seating at Diddle Arena |
|||
|
Other Funds |
5,000,000 |
-0- |
||
|
016. |
Enhance Avenue of Champions Streetscaping |
|||
|
Restricted Funds |
2,000,000 |
-0- |
||
|
Other Funds |
2,000,000 |
-0- |
||
|
TOTAL |
4,000,000 |
-0- |
||
|
017. |
Construct South Plaza |
|||
|
Other Funds |
3,600,000 |
-0- |
||
|
018. |
Purchase Property/Parking and Street Improve |
|||
|
Restricted Funds |
3,000,000 |
-0- |
||
|
019. |
Purchase Property for Campus Expansion |
|||
|
Restricted Funds |
3,000,000 |
-0- |
||
|
020. |
Acquire Furniture, Fixtures, and Equipment for Hilltopper Fieldhouse |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
021. |
Install New Turf on Athletic Fields |
|||
|
Other Funds |
3,000,000 |
-0- |
||
|
022. |
Renovate State/Normal Street Properties |
|||
|
Restricted Funds |
2,000,000 |
-0- |
||
|
023. |
Asset Preservation--2022-2024 Reauthorization ($10,212,000 Restricted Funds) |
|||
|
024. |
Construct New Gordon Ford College of Business Additional Reauthorization |
|||
|
($74,400,000 Bond Funds, $25,000,000 Agency Bonds) |
||||
|
025. |
Construct, Renovate, and Improve Athletics Facilities Reauthorization ($8,434,300 |
|||
|
Agency Bonds) |
||||
|
026. |
Guaranteed Energy Savings Performance Contracts |
|||
|
027. |
Lease--Alumni Center |
|||
|
028. |
Lease--Parking Garage |
|||
|
029. |
Lease--Nursing/Physical Therapy |
|||
|
11. |
KENTUCKY COMMUNITY AND TECHNICAL COLLEGE SYSTEM |
|||
|
001. |
Asset Preservation Pool--2024-2026 |
|||
|
Bond Funds |
35,500,000 |
35,500,000 |
||
|
002. |
Efficient Operations and Innovation Plan |
|||
|
Bond Funds |
-0- |
90,000,000 |
||
|
003. |
Renovate Occupational Technical Building Phase II--Elizabethtown CTC |
|||
|
Bond Funds |
44,000,000 |
-0- |
||
|
004. |
Construct Quad and Green Space--Jefferson CTC |
|||
|
Restricted Funds |
8,000,000 |
-0- |
||
|
005. |
Construct Fire Academy Dormitory--Fire Commission |
|||
|
Restricted Funds |
7,800,000 |
-0- |
||
|
006. |
Expand Culinary Arts Program--Elizabethtown CTC |
|||
|
Restricted Funds |
5,000,000 |
-0- |
||
|
007. |
Property Acquisition Pool--Fire Commission--2024-2026 |
|||
|
Restricted Funds |
5,000,000 |
-0- |
||
|
008. |
KCTCS Equipment Pool--2024-2026 |
|||
|
Restricted Funds |
2,500,000 |
-0- |
||
|
Federal Funds |
2,500,000 |
-0- |
||
|
TOTAL |
5,000,000 |
-0- |
||
|
009. |
KCTCS Property Acquisition Pool--2024-2026 |
|||
|
Restricted Funds |
5,000,000 |
-0- |
||
|
010. |
Acquisition of System Office Building |
|||
|
Restricted Funds |
4,000,000 |
-0- |
||
|
011. |
Construct Multicultural Center Atrium Enclosure--JCTC |
|||
|
Restricted Funds |
3,000,000 |
-0- |
||
|
012. |
Procure Training Equipment--Fire Commission |
|||
|
Restricted Funds |
2,000,000 |
-0- |
||
|
013. |
Construct Fire Academy Maintenance Building--Fire Commission |
|||
|
Restricted Funds |
2,000,000 |
-0- |
||
|
014. |
Acquire and Improve Parking Lots--JCTC--Additional Reauthorization ($5,000,000 |
|||
|
Restricted Funds) |
||||
|
Restricted Funds |
2,000,000 |
-0- |
||
|
015. |
Procure CDL Simulators--Gateway CTC |
|||
|
Restricted Funds |
800,000 |
-0- |
||
|
016. |
Asset Preservation Pool--2022-2024 Reauthorization ($26,890,000 Restricted Funds) |
|||
|
017. |
Lease--Elizabethtown CTC--Hardin County |
|||
|
018. |
Lease--Jefferson CTC--Bullitt County Campus |
|||
|
019. |
Lease--Jefferson CTC--Jefferson Education Center |
|||
|
020. |
Lease--KCTCS System Office |
J. PUBLIC PROTECTION CABINET
|
Budget Units |
2024-25 |
2025-26 |
||
|
1. |
HOUSING, BUILDINGS AND CONSTRUCTION |
|||
|
001. |
Modernize Application System6 |
|||
|
Restricted Funds |
1,944,000 |
1,644,000 |
K. TOURISM, ARTS AND HERITAGE CABINET
|
Budget Units |
2024-25 |
2025-26 |
||
|
1. |
ARTISANS CENTER |
|||
|
001. |
Maintenance Pool--2024-2026 |
|||
|
Investment Income |
500,000 |
500,000 |
||
|
2. |
PARKS |
|||
|
001. |
Maintenance Pool--2024-2026 |
|||
|
Investment Income |
10,000,000 |
10,000,000 |
||
|
002. |
Utility Infrastructure Replacement Phase 2 |
|||
|
Bond Funds |
25,000,000 |
20,000,000 |
||
|
003. |
Wastewater Treatment Plant System Upgrades--Multiple Parks |
|||
|
Bond Funds |
9,000,000 |
9,000,000 |
||
|
004. |
Jenny Wiley Marina Reconstruction |
|||
|
Bond Funds |
-0- |
12,200,000 |
||
|
005. |
JJ Audubon Beach House Conversion |
|||
|
Bond Funds |
1,045,000 |
-0- |
||
|
006. |
Kenlake Structure Refurbishment (Cherokee) |
|||
|
Bond Funds |
1,500,000 |
-0- |
||
|
007. |
Cumberland Falls Lodge Room Upgrade/Reconfiguration |
|||
|
Bond Funds |
1,500,000 |
8,500,000 |
||
|
008. |
Lake Barkley--Lodge Wing Exterior Repair |
|||
|
Bond Funds |
2,000,000 |
4,000,000 |
||
|
009. |
Yatesville Marina Replacement |
|||
|
Bond Funds |
1,000,000 |
14,000,000 |
||
|
010. |
JJ Audubon New Conference Center |
|||
|
Bond Funds |
3,125,000 |
4,375,000 |
||
|
011. |
Big Bone Lick State Park Nature Center |
|||
|
Restricted Funds |
3,125,000 |
-0- |
||
|
012. |
Conference Center Upgrades |
|||
|
Bond Funds |
3,065,000 |
-0- |
||
|
013. |
Lake Barkley Fitness Center Upgrades |
|||
|
Bond Funds |
3,000,000 |
-0- |
||
|
014. |
Perryville ADA Accessible Restroom Facility |
|||
|
Restricted Funds |
1,545,000 |
-0- |
||
|
015. |
Jenny Wiley New Archery Center |
|||
|
Bond Funds |
1,450,000 |
-0- |
||
|
016. |
Pennyrile Beach Complex Repair/Upgrade |
|||
|
Bond Funds |
1,200,000 |
-0- |
||
|
3. |
HORSE PARK COMMISSION |
|||
|
001. |
Maintenance Pool--2024-2026 |
|||
|
Bond Funds |
1,500,000 |
1,500,000 |
||
|
4. |
STATE FAIR BOARD |
|||
|
001. |
Kentucky Exposition Center Paving Pool |
|||
|
Bond Funds |
10,000,000 |
-0- |
||
|
002. |
Construct Kentucky Exposition Center Dirt/Salt Storage Facility |
|||
|
Investment Income |
500,000 |
-0- |
||
|
003. |
Maintenance Pool--2024-2026 |
|||
|
Investment Income |
3,000,000 |
3,000,000 |
||
|
004. |
Backup Power Supply |
|||
|
Bond Funds |
30,000,000 |
-0- |
||
|
005. |
Upgrade Air Handling and Filtration System |
|||
|
Bond Funds |
2,000,000 |
2,000,000 |
||
|
006. |
Replace IT Infrastructure |
|||
|
Bond Funds |
2,100,000 |
-0- |
||
|
007. |
Land Acquisition |
|||
|
Investment Income |
1,090,000 |
-0- |
||
|
008. |
Kentucky Exposition Center Redevelopment Plan Phase II |
|||
|
Bond Funds |
-0- |
212,709,000 |
||
|
5. |
FISH AND WILDLIFE RESOURCES |
|||
|
001. |
Fees-in-Lieu-of Stream Mitigation Projects Pool |
|||
|
Restricted Funds |
64,500,000 |
48,600,000 |
||
|
002. |
Construct Camp Earl Wallace Dining Hall |
|||
|
Restricted Funds |
1,935,000 |
-0- |
||
|
Federal Funds |
2,565,000 |
-0- |
||
|
TOTAL |
4,500,000 |
-0- |
||
|
003. |
Cumberland Forest Conservation Program/Ataya |
|||
|
Federal Funds |
6,650,000 |
-0- |
||
|
004. |
Construct Lakes and Streams Building |
|||
|
Restricted Funds |
430,000 |
-0- |
||
|
Federal Funds |
1,173,000 |
-0- |
||
|
TOTAL |
1,603,000 |
-0- |
||
|
005. |
Ballard Wildlife Management Area Big Pump--Additional |
|||
|
Federal Funds |
4,125,000 |
-0- |
||
|
Other Funds |
1,375,000 |
-0- |
||
|
TOTAL |
5,500,000 |
-0- |
||
|
006. |
Construct Critical Species Investigation Building |
|||
|
Federal Funds |
1,602,000 |
-0- |
||
|
007. |
Construct Veterans' Memorial Shooting Range |
|||
|
Restricted Funds |
400,000 |
-0- |
||
|
Federal Funds |
3,600,000 |
-0- |
||
|
TOTAL |
4,000,000 |
-0- |
||
|
008. |
Maintenance Pool--2024-2026 |
|||
|
Restricted Funds |
1,500,000 |
1,500,000 |
||
|
Federal Funds |
1,500,000 |
1,500,000 |
||
|
TOTAL |
3,000,000 |
3,000,000 |
||
|
6. |
HISTORICALd SOCIETY |
|||
|
001. |
Kentucky Old State Capitol Preservation |
|||
|
Bond Funds |
1,192,000 |
993,000 |
||
|
Other Funds |
105,000 |
64,000 |
||
|
TOTAL |
1,297,000 |
1,057,000 |
||
|
7. |
KENTUCKY CENTER FOR THE ARTS |
|||
|
001. |
Maintenance Pool--2024-2026 |
|||
|
Investment Income |
550,000 |
550,000 |
||
|
002. |
Renovate Building to Improve Security |
|||
|
Investment Income |
625,000 |
900,000 |
Cite this article: FindLaw.com - Kentucky Revised Statutes Title VI. Financial Administration § Appendix A, Pt. II Appendix A, Pt. II. State/Executive Branch Budget - last updated January 01, 2025 | https://codes.findlaw.com/ky/title-vi-financial-administration/ky-rev-st-sect-appendix-a-pt-ii/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)