Learn About The Law
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Current as of January 02, 2024 | Updated by Findlaw Staff
Sec. 2. (a) As used in this chapter, “energy production zone” means a premise of land on which any of the following was located as of January 1, 2025:
(1) An electric generation facility with a generating capacity of at least eighty (80) megawatts, regardless of whether the electric generation facility is operational.
(2) A surface or underground mine at which mining operations are no longer occurring.
(b) The term does not include a premise of land on which either of the following was located as of January 1, 2025:
(1) One (1) or more wind power devices (as defined in IC 8-1-41-7) that are integrated into an electric generation facility.
(2) One (1) or more commercial solar energy systems (as defined in IC 8-1-42-2).
Cite this article: FindLaw.com - Indiana Code Title 8. Utilities and Transportation § 8-1-8.2-2 - last updated January 02, 2024 | https://codes.findlaw.com/in/title-8-utilities-and-transportation/in-code-sect-8-1-8-2-2/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)