Learn About The Law
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Current as of January 01, 2025 | Updated by Findlaw Staff
§ 3-14. Employment of Engineer--Engineer's Report. The temporary commissioners shall, unless otherwise authorized by the court, employ an engineer who shall be a registered professional engineer competent in the design and operation of drainage systems, to assist them in the performance of their duties. If an engineer is employed, he shall make such surveys and estimates as the commissioners may direct. If the engineer recommends the organization of the district and the performance of work, and the temporary commissioners concur in this recommendation, then the engineer shall prepare a report, which report shall include (a) a description of the existing drainage facilities and conditions in the proposed district; (b) a description of the system of drainage which he recommends to be constructed by the district, giving the route, length and termini of proposed levees, open ditches and tile drains, the top elevations and dimensions of levees, the gradients, bottom widths and side slopes of proposed open ditches, the diameter and gradients of proposed tile drains, the type, plan, location and capacity of proposed pumping plants, and the nature and location of all other work or structures proposed for construction, operation or maintenance by the district; (c) specifications for the performance of the work recommended; (d) a description of the rights-of-way necessary for the performance of the work recommended; (e) complete estimates of costs; (f) a map of the proposed district, showing the boundaries described in the petition, any recommended changes in the boundaries and the nature and location of the proposed work; (g) such profile, cross-sectional and other drawings as may be necessary to describe the proposed work; and (h) the approximate number of acres in the proposed district and such other information as may be required by the commissioners.
Cite this article: FindLaw.com - Illinois Statutes Chapter 70. Special Districts § 605/3-14. Employment of Engineer--Engineer's Report - last updated January 01, 2025 | https://codes.findlaw.com/il/chapter-70-special-districts/il-st-sect-70-605-3-14/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)