As used in this part—
CMAQ means Congestion Mitigation and Air Quality Improvement Program (23 U.S.C. 149).
Environmental assessment (“EA”) means the environmental assessment in support of the project description and containing the information listed in § 268.11(b)(6)(i).
Environmental impact statement (“EIS”) means the environmental impact statement which is required pursuant to §§ 268.3.
Eligible project costs means the costs of preconstruction planning activities and the capital cost of the fixed guideway infrastructure of a Maglev project, including land, piers, guideways, propulsion equipment and other components attached to guideways, power distribution facilities (including substations), control and communications facilities, access roads, and storage, repair, and maintenance facilities, but eligible project costs do not include the cost of stations, vehicles, and equipment.
Federal Maglev funds means such funds as are provided under the authority of 23 U.S.C. 322 to pay for Eligible Project Costs.
Full project costs means the total capital costs of a Maglev project, including Eligible Project Costs and the costs of stations, vehicles, and equipment.
Phase means one of the five different phases of the Maglev Deployment Program; these phases are described in § 268.3.
Maglev means transportation systems employing magnetic levitation that would be capable of safe use by the public at a speed in excess of 240 miles per hour.
Maglev Deployment Program means the program authorized by 23 U.S.C. 322.
Partnership potential means the usage of the term in the commercial feasibility study of high-speed ground transportation (High Speed Ground Transportation for America) mandated under section 1036 of the Intermodal Surface Transportation Efficiency Act of 1991 (105 Stat. 1978). Under that usage any corridor exhibiting Partnership Potential must at least meet the following two conditions:
(1) Private enterprise must be able to run on the corridor—once built and paid for—as a completely self-sustaining entity; and
(2) The total benefits of a Maglev corridor must equal or exceed its total costs.
STP means the Surface Transportation Program (23 U.S.C. 133).
TEA 21 means the Transportation Equity Act for the 21st Century (Public Law No. 105–178, 112 Stat. 107).
Cite this article: FindLaw.com - Code of Federal Regulations Title 49. Transportation § 49.268.1 Definitions - last updated October 02, 2022 | https://codes.findlaw.com/cfr/title-49-transportation/cfr-sect-49-268-1/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature or via Westlaw before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw's Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)