(a) Except as otherwise provided in this section and in § 195.305(b), no operator may operate a pipeline unless it has been pressure tested under this subpart without leakage. In addition, no operator may return to service a segment of pipeline that has been replaced, relocated, or otherwise changed until it has been pressure tested under this subpart without leakage.
(b) Except for pipelines converted under § 195.5, the following pipelines may be operated without pressure testing under this subpart:
(1) Any hazardous liquid pipeline whose maximum operating pressure is established under § 195.406(a)(5) that is—
(i) An interstate pipeline constructed before January 8, 1971;
(ii) An interstate offshore gathering line constructed before August 1, 1977;
(iii) An intrastate pipeline constructed before October 21, 1985; or
(iv) A low-stress pipeline constructed before August 11, 1994 that transports HVL.
(2) Any carbon dioxide pipeline constructed before July 12, 1991, that—
(i) Has its maximum operating pressure established under § 195.406(a)(5); or
(ii) Is located in a rural area as part of a production field distribution system.
(3) Any low-stress pipeline constructed before August 11, 1994 that does not transport HVL.
(4) Those portions of older hazardous liquid and carbon dioxide pipelines for which an operator has elected the risk-based alternative under § 195.303 and which are not required to be tested based on the risk-based criteria.
(c) Except for pipelines that transport HVL onshore, low-stress pipelines, and pipelines covered under § 195.303, the following compliance deadlines apply to pipelines under paragraphs (b)(1) and (b)(2)(i) of this section that have not been pressure tested under this subpart:
(1) Before December 7, 1998, for each pipeline each operator shall—
(i) Plan and schedule testing according to this paragraph; or
(ii) Establish the pipeline's maximum operating pressure under § 195.406(a)(5).
(2) For pipelines scheduled for testing, each operator shall—
(i) Before December 7, 2000, pressure test—
(A) Each pipeline identified by name, symbol, or otherwise that existing records show contains more than 50 percent by mileage (length) of electric resistance welded pipe manufactured before 1970; and
(B) At least 50 percent of the mileage (length) of all other pipelines; and
(ii) Before December 7, 2003, pressure test the remainder of the pipeline mileage (length).
Cite this article: FindLaw.com - Code of Federal Regulations Title 49. Transportation § 49.195.302 General requirements - last updated January 02, 2025 | https://codes.findlaw.com/cfr/title-49-transportation/cfr-sect-49-195-302/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)