Learn About the Law
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Current as of October 02, 2022 | Updated by FindLaw Staff
(a) An operator must use API RP 80 (incorporated by reference, see § 192.7), to determine if an onshore pipeline (or part of a connected series of pipelines) is an onshore gathering line. The determination is subject to the limitations listed below. After making this determination, an operator must determine if the onshore gathering line is a regulated onshore gathering line under paragraph (b) of this section.
(1) The beginning of gathering, under section 2.2(a)(1) of API RP 80, may not extend beyond the furthermost downstream point in a production operation as defined in section 2.3 of API RP 80. This furthermost downstream point does not include equipment that can be used in either production or transportation, such as separators or dehydrators, unless that equipment is involved in the processes of “production and preparation for transportation or delivery of hydrocarbon gas” within the meaning of “production operation.”
(2) The endpoint of gathering, under section 2.2(a)(1)(A) of API RP 80, may not extend beyond the first downstream natural gas processing plant, unless the operator can demonstrate, using sound engineering principles, that gathering extends to a further downstream plant.
(3) If the endpoint of gathering, under section 2.2(a)(1)(C) of API RP 80, is determined by the commingling of gas from separate production fields, the fields may not be more than 50 miles from each other, unless the Administrator finds a longer separation distance is justified in a particular case (see 49 CFR § 190.9).
(4) The endpoint of gathering, under section 2.2(a)(1)(D) of API RP 80, may not extend beyond the furthermost downstream compressor used to increase gathering line pressure for delivery to another pipeline.
(b) For purposes of § 192.9, “regulated onshore gathering line” means:
(1) Each onshore gathering line (or segment of onshore gathering line) with a feature described in the second column that lies in an area described in the third column; and
(2) As applicable, additional lengths of line described in the fourth column to provide a safety buffer:
Type | Feature | Area | Safety buffer | |
---|---|---|---|---|
A․․․․․․․․․․ | —Metallic and the MAOP produces a hoop stress of 20 percent or more of SMYS. If the stress level is unknown, an operator must determine the stress level according to the applicable provisions in subpart C of this part | Class 2, 3, or 4 location (see § 192.5) | None. | |
—Non-metallic and the MAOP is more than 125 psig (862 kPa) | ||||
B․․․․․․․․․․ | —Metallic and the MAOP produces a hoop | Area 1. Class 3 or 4 location | If the gathering line is in Area 2(b) | |
stress of less than 20 percent of SMYS. If the stress level is unknown, an operator must determine the stress | Area 2. An area within a Class 2 location the operator determines by using any of the following three methods: | or 2(c), the additional lengths of line extend upstream and downstream from the area to a point where the line is at | ||
level according to the applicable | (a) | A Class 2 location. | least 150 feet (45.7 m) from the nearest | |
provisions in subpart C of this part | (b) | An area extending 150 feet (45.7 m) on each side | dwelling in the area. However, if a cluster of dwellings in Area 2 | |
—Non-metallic and the MAOP is 125 psig (862 kPa) or less | of the centerline of any continuous 1 mile (1.6 km) of pipeline and including more than 10 but fewer than 46 dwellings | (b) or 2(c) qualifies a line as Type B, the Type B classification ends 150 feet (45.7 m) from the nearest dwelling in the cluster. | ||
(c) | An area extending 150 feet (45.7 m) on each side of the centerline of any continuous 1000 feet (305 m) of pipeline and including 5 or more dwellings |
Cite this article: FindLaw.com - Code of Federal Regulations Title 49. Transportation § 49.192.8 How are onshore gathering lines and regulated onshore gathering lines determined? - last updated October 02, 2022 | https://codes.findlaw.com/cfr/title-49-transportation/cfr-sect-49-192-8/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature or via Westlaw before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw's Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)