U.S. Federal and State Cases, Codes, and Articles
Select a tab to search United States Cases, Codes, or Articles
U.S. Federal and State Cases, Codes, and Articles
Select a tab to search United States Cases, Codes, or Articles
Search for cases
Indicates required field
Search by keyword or citation
Indicates required field
Search blogs, article pages, and cases and codes
Indicates required field
Current as of October 02, 2022 | Updated by FindLaw Staff
Leakage surveys of a transmission line must be conducted at intervals not exceeding 15 months, but at least once each calendar year. However, in the case of a transmission line which transports gas in conformity with § 192.625 without an odor or odorant, leakage surveys using leak detector equipment must be conducted—
(a) In Class 3 locations, at intervals not exceeding 7 1/2 months, but at least twice each calendar year; and
(b) In Class 4 locations, at intervals not exceeding 4 1/2 months, but at least four times each calendar year.
Cite this article: FindLaw.com - Code of Federal Regulations Title 49. Transportation § 49.192.706 Transmission lines: Leakage surveys - last updated October 02, 2022 | https://codes.findlaw.com/cfr/title-49-transportation/cfr-sect-49-192-706/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature or via Westlaw before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw's Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)