(a) Halocarbon systems. A pressure test using the extinguishing agent, air or inert gas, must be conducted on halocarbon system discharge piping on completion of piping installation and before extinguishing agent cylinders are connected.
(1) Except as otherwise specified in this section:
(i) Piping from the cylinders to the stop valves or selector valves must be subjected to a pressure of 1 1/2 times the cylinder charging pressure at 70° Fahrenheit; and
(ii) The leakage during a 2–minute period must not exceed a pressure drop of 10 percent of the test pressure.
(2) Individual branch lines to a protected space must be tested as described in paragraph (a)(1) of this section, except that:
(i) The pressure must be 150 pounds per square inch; and
(ii) Distribution piping must be capped within the protected space at the first joint upstream of the nozzles.
(3) Pneumatic actuation piping must be tested as described in paragraph (a)(1) of this section.
(b) Inert gas systems. A pressure test using air or inert gas must be conducted on each inert gas system's piping on completion of piping installation and before extinguishing agent cylinders are connected.
(1) Except as otherwise specified in this section:
(i) Piping from the cylinders to the stop valves or selector valves must be subjected to a pressure of 1,000 pounds per square inch (psi) at 70° Fahrenheit; and
(ii) The leakage during a 2–minute period must not exceed a pressure drop of 100 psi.
(2) Individual branch lines to a protected space must be tested as described in paragraph (b)(1) of this section, except that:
(i) The pressure must be 600 psi; and
(ii) Distribution piping must be capped within the protected space at the first joint upstream of the nozzles.
(3) Pneumatic actuation piping must be tested as described in paragraph (b)(1) of this section.
(c) Small independent systems. In lieu of test requirements in paragraphs (a) or (b) of this section, a small independent halocarbon or inert gas system, like those found in emergency generator rooms and paint lockers, may be tested by blowing out the piping with air pressure of at least 100 psi, if:
(1) There are no valves in the system discharge piping; and
(2) There is not more than one change in direction between the agent container and the discharge nozzle.
Cite this article: FindLaw.com - Code of Federal Regulations Title 46. Shipping § 46.95.16–60 System piping installation testing - last updated January 02, 2025 | https://codes.findlaw.com/cfr/title-46-shipping/cfr-sect-46-95-16-60/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)