Submit a completed and signed commercial permit form, to BLM, containing the following information:
(a) The design specifications, and the inspection and calibration schedule of production, injection, and royalty meters;
(b) A schematic diagram of the utilization site or individual well, showing the location of each production and royalty meter. If the sales point is located off the utilization site, give us a generalized schematic diagram of the electrical transmission or pipeline system, including meter locations;
(c) A copy of the sales contract for the sale and/or utilization of geothermal resources;
(d) A description and analysis of reservoir, production, and injection characteristics, including the flow rates, temperatures, and pressures of each production and injection well;
(e) A schematic diagram of each production and injection well showing the wellhead configuration, including meters;
(f) A schematic flow diagram of the utilization facility, including interconnections with other facilities, if applicable;
(g) A description of the utilization process in sufficient detail to enable BLM to determine whether the resource will be utilized in a manner consistent with law and regulations;
(h) The planned safety provisions for emergency shutdown to protect public health, safety, property, and the environment. This should include a schedule for the testing and maintenance of safety devices;
(i) The environmental and operational parameters that will be monitored during the operation of the facility and/or well(s); and
(j) Any additional information or data that we may require.
Cite this article: FindLaw.com - Code of Federal Regulations Title 43. Public Lands: Interior § 43.3274.11 What must I give BLM to approve my commercial use permit application? - last updated January 02, 2025 | https://codes.findlaw.com/cfr/title-43-public-lands-interior/cfr-sect-43-3274-11/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)