Learn About The Law
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Current as of January 02, 2025 | Updated by Findlaw Staff
Certain instances of noncompliance warrant the imposition of immediate assessments upon discovery, as prescribed in the following table. Imposition of these assessments does not preclude other appropriate enforcement actions:
|
Table 1 to § 3173.29—Violations Subject to an Immediate Assessment |
|
|---|---|
|
Violation |
Assessment amount per violation ($) |
|
1. An appropriate valve on an oil storage tank was not sealed, as required by § 3173.2 |
1,000 |
|
2. An appropriate valve or component on an oil metering system was not sealed, as required by § 3173.3 |
1,000 |
|
3. A Federal seal is removed without prior approval of the AO or AR, as required by § 3173.4 |
1,000 |
|
4. Oil was not properly measured before removal from storage for use on a different lease, unit, or CA, as required by § 3173.7(b) |
1,000 |
|
5. An FMP was bypassed, in violation of § 3170.4 |
1,000 |
|
6. Theft or mishandling of production was not reported to the BLM, as required by § 3173.8 |
1,000 |
|
7. Records necessary to determine quantity and quality of production were not retained, as required by § 3170.7 |
1,000 |
|
8. FMP application was not submitted, as required by § 3173.12 |
1,000 |
|
9. (i) For facilities that begin operation after January 17, 2017, BLM approval for off-lease measurement was not obtained before removing production, as required by § 3173.23 |
1,000 |
|
(ii) Facilities that were in operation on or before January 17, 2017, are subject to an assessment if they do not have an existing BLM approval for off-lease measurement. |
|
|
10. (i) For facilities that begin operation after January 17, 2017, BLM approval for surface commingling was not obtained before removing production, as required by § 3173.15 |
1,000 |
|
(ii) Facilities that were in operation on or before January 17, 2017, are subject to an assessment if they do not have an existing BLM approval for surface commingling. |
|
|
11. (i) For facilities that begin operation after January 17, 2017, BLM approval for downhole commingling was not obtained before removing production, as required by § 3173.15 |
1,000 |
|
(ii) Facilities that were in operation on or before January 17, 2017, are subject to an assessment if they do not have an existing BLM approval for downhole commingling. |
Cite this article: FindLaw.com - Code of Federal Regulations Title 43. Public Lands: Interior § 43.3173.29 Immediate assessments for certain violations - last updated January 02, 2025 | https://codes.findlaw.com/cfr/title-43-public-lands-interior/cfr-sect-43-3173-29/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)