Learn About The Law
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Current as of January 02, 2025 | Updated by Findlaw Staff
(a) The BLM may determine the locations and boundaries of right-of-way corridors or designated leasing areas during the land use planning process described in part 1600 of this chapter. During this process, the BLM coordinates with other Federal agencies, State, local, and tribal governments, and the public to identify resource-related issues, concerns, and needs. The process results in a resource management plan or plan amendment, which addresses the extent to which you may use public lands and resources for specific purposes.
(b) When determining which lands may be suitable for right-of-way corridors or designated leasing areas, the factors the BLM considers include, but are not limited to, the following:
(1) Federal, state, and local land use plans, and applicable Federal, state, local, and tribal laws;
(2) Environmental impacts on cultural resources and natural resources, including air, water, soil, fish, wildlife, and vegetation;
(3) Physical effects and constraints on corridor placement or leasing areas due to geology, hydrology, meteorology, soil, or land forms;
(4) Costs of construction, operation, and maintenance and costs of modifying or relocating existing facilities in a proposed right-of-way corridor or designated leasing area (i.e., the economic efficiency of placing a right-of-way within a proposed corridor or providing a lease inside a designated leasing area);
(5) Risks to national security;
(6) Potential health and safety hazards imposed on the public by facilities or activities located within the proposed right-of-way corridor or designated leasing area;
(7) Social and economic impacts of the right-of-way corridor or designated leasing area on public land users, adjacent landowners, and other groups or individuals;
(8) Transportation and utility corridor studies previously developed by user groups; and
(9) Engineering and technological compatibility of proposed and existing facilities.
(c) BLM may designate any transportation and utility corridor existing prior to October 21, 1976, as a transportation and utility corridor without further review.
(d) The resource management plan or plan amendment may also identify areas where the BLM will not allow right-of-way corridors or designated leasing areas for environmental, safety, or other reasons.
Cite this article: FindLaw.com - Code of Federal Regulations Title 43. Public Lands: Interior § 43.2802.11 How does the BLM designate right-of-way corridors and designated leasing areas? - last updated January 02, 2025 | https://codes.findlaw.com/cfr/title-43-public-lands-interior/cfr-sect-43-2802-11/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)