Current as of January 02, 2025 | Updated by Findlaw Staff
(a) General requirements.
(1) An audit shall be performed by an auditor who meets the requirements of § 80.1471.
(2) An audit shall be based on either an Option A QAP per § 80.1469(a) during the interim period, an Option B QAP per § 80.1469(b) during the interim period, or a QAP per § 80.1469(c).
(3) Each audit shall verify every element contained in an applicable and approved QAP.
(4) Each audit shall include a review of documents generated by the renewable fuel producer.
(b) On-site visits—
(1) Option A QAP during the interim period.
(i) The auditor shall conduct an on-site visit at the renewable fuel production facility at least 4 times per calendar year.
(ii) The on-site visits specified in paragraph (b)(1)(i) of this section shall occur at least 60 days apart. The 60–day period shall start the day after the previous on-site ends.
(iii) The on-site visit shall include verification of all QAP elements that require inspection or evaluation of the physical attributes of the renewable fuel production facility, except for any physical attribute that is verified through remote monitoring equipment per the applicable QAP.
(2) Option B QAP during the interim period.
(i) The auditor shall conduct an on-site visit at the renewable fuel production facility at least 4 times per calendar year.
(ii) The on-site visits specified in paragraph (b)(2)(i) of this section shall occur at least 60 days apart. The 60–day period shall start the day after the previous on-site ends.
(iii) The on-site visit shall include verification of all QAP elements that require inspection or evaluation of the physical attributes of the renewable fuel production facility.
(3) QAP.
(i) The independent third-party auditor shall conduct an on-site visit at the renewable fuel production facility or foreign ethanol production facility:
(A) At least two times per calendar year; or
(B) In the event an auditor uses a remote monitoring system approved by the EPA, at least one time per calendar year.
(ii) An on-site visit specified in paragraph (b)(3)(i) of this section shall occur no more than:
(A) 200 days after the previous on-site visit. The 200–day period shall start the day after the previous on-site visit ends; or
(B) 380 days after the previous on-site visit if a previously approved (by EPA) remote monitoring system is in place at the renewable fuel production facility or foreign ethanol production facility, as applicable. The 380–day period shall start the day after the previous on-site visit ends.
(iii) An on-site visit shall include verification of all QAP elements that require inspection or evaluation of the physical attributes of the renewable fuel production facility or foreign ethanol production facility.
(iv) The on-site visit shall be overseen by a professional engineer, as specified in § 80.1450(b)(2)(i)(A) and (b)(2)(i)(B).
Cite this article: FindLaw.com - Code of Federal Regulations Title 40. Protection of Environment § 40.80.1472 Requirements for quality assurance audits - last updated January 02, 2025 | https://codes.findlaw.com/cfr/title-40-protection-of-environment/cfr-sect-40-80-1472/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)