Learn About The Law
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Current as of January 02, 2025 | Updated by Findlaw Staff
|
Control technique |
Parameters to be monitored |
Established operating parameter(s) |
|---|---|---|
|
Thermal incinerator |
Firebox temperature |
Minimum temperature. |
|
Catalytic incinerator |
Temperature upstream and downstream of the catalyst bed |
Minimum upstream temperature; and minimum temperature difference across the catalyst bed. |
|
Boiler or process heater |
Firebox temperature |
Minimum temperature. |
|
Absorber |
Liquid flow rate or pressure drop; and pH of scrubber effluent, if an acid or base absorbent is used |
Minimum flow rate or pressure drop; and maximum pH if an acid absorbent is used, or minimum pH if a base absorbent is used. |
|
Condenser |
Exit temperature |
Maximum temperature. |
|
Carbon adsorber |
Total regeneration stream mass or volumetric flow during carbon bed regeneration cycle; and temperature of the carbon bed after regeneration (and within 15 minutes of completing any cooling cycle(s)) |
Maximum mass or volumetric flow; and maximum temperature. |
|
Extended Cookout (ECO) |
Time from the end of the epoxide feed to the end of the ECO, or the reactor epoxide partial pressure at the end of the ECO, or the epoxide concentration in the reactor liquid at the end of the ECO |
Minimum duration, or maximum partial pressure at the end of ECO, or maximum epoxide concentration in the reactor liquid at the end of ECO. |
|
Other devices (or as an alternate to the above).a |
HAP concentration level or reading at outlet of device |
Maximum HAP concentration or reading. |
a Concentration is measured instead of an operating parameter.
Cite this article: FindLaw.com - Code of Federal Regulations Title 40. Protection of Environment 40 CFR Pt. 63, Subpt. PPP, Tbl. 7 TABLE 7 TO SUBPART PPP OF PART 63—OPERATING PARAMETERS FOR WHICH MONITORING LEVELS ARE REQUIRED TO BE ESTABLISHED FOR PROCESS VENT STREAMS - last updated January 02, 2025 | https://codes.findlaw.com/cfr/title-40-protection-of-environment/cfr-pt-40-63-subpt-ppp-tbl-7/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)