As stated in § 63.9050(a), you must submit a compliance report that includes the information in § 63.9050(c) through (e) as well as the information in the following table.For existing sources and for new or reconstructed sources which commenced construction or reconstruction after April 17, 2003, but before February 5, 2019, before October 13, 2020, you must also submit startup, shutdown, and malfunction reports according to the requirements in § 63.9050(f) and the following table. A startup, shutdown, and malfunction plan is not required after October 13, 2020.
|
Table 6 to Subpart NNNNN of Part 63—Requirements for Reports |
|
|---|---|
|
If . . . |
Then you must submit a report or statement that: |
|
1. There are no deviations from any emission limitations that apply to you |
There were no deviations from any emission limitations that apply to you during the reporting period. Include this statement in the compliance report. |
|
2. There were no periods during which the operating parameter monitoring systems were out-of-control in accordance with the monitoring plan |
There were no periods during which the CMS were out-of-control during the reporting period. Include this statement in the compliance report. |
|
3. There was a deviation from any emission limitation during the reporting period |
Contains the information in § 63.9050(d). Include this statement in the compliance report. |
|
4. There were periods during which the operating parameter monitoring systems were out-of-control in accordance with the monitoring plan |
Contains the information in § 63.9050(d). Include this statement in the compliance report. |
|
5. There was a startup, shutdown, and malfunction during the reporting period that is not consistent with your startup, shutdown, and malfunction plan |
For existing sources and for new or reconstructed sources which commenced construction or reconstruction after April 17, 2003, but before February 5, 2019, before October 13, 2020, contains the information in § 63.9050(f). Include this statement in the compliance report. A startup, shutdown, and malfunction plan is not required after October 13, 2020. |
|
6. There were periods when the procedures in the LDAR plan were not followed |
Contains the information in § 63.9050(c)(7). Include this statement in the compliance report. |
Cite this article: FindLaw.com - Code of Federal Regulations Title 40. Protection of Environment 40 CFR Pt. 63, Subpt. NNNNN, Tbl. 6 Table 6 to Subpart NNNNN of Part 63—Requirements for Reports - last updated January 02, 2025 | https://codes.findlaw.com/cfr/title-40-protection-of-environment/cfr-pt-40-63-subpt-nnnnn-tbl-6/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)