Learn About The Law
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Current as of January 02, 2025 | Updated by Findlaw Staff
|
Table 1 to Subpart EEEEE of Part 63—Applicability of General Provisions to This Subpart |
|||
|---|---|---|---|
|
[As stated in § 63.7760, you must meet each requirement in the following table that applies to you] |
|||
|
Citation |
Subject |
Applies to this subpart? |
Explanation |
|
63.1 |
Applicability |
Yes |
|
|
63.2 |
Definitions |
Yes |
|
|
63.3 |
Units and abbreviations |
Yes |
|
|
63.4 |
Prohibited activities |
Yes |
|
|
63.5 |
Construction/reconstruction |
Yes |
|
|
63.6(a) through (d) |
Compliance applicability and dates |
Yes |
|
|
63.6(e) |
Operating and maintenance requirements |
No |
This subpart specifies operating and maintenance requirements. |
|
63.6(f)(1) |
Applicability of non-opacity emission standards |
No |
This subpart specifies applicability of non-opacity emission standards. |
|
63.6(f)(2) through (3) |
Methods and finding of compliance with non-opacity emission standards |
Yes |
|
|
63.6(g) |
Use of an alternative nonopacity emission standard |
Yes |
|
|
63.6(h)(1) |
Applicability of opacity and visible emissions standards |
No |
This subpart specifies applicability of opacity and visible emission standards. |
|
63.6(h)(2) through (9) |
Methods and other requirements for opacity and visible emissions standards |
Yes |
|
|
63.6(i) through (j) |
Compliance extension and Presidential compliance exemption |
Yes |
|
|
63.7(a)(1) through (2) |
Applicability and performance test dates |
No |
This subpart specifies applicability and performance test dates. |
|
63.7(a)(3) through (4) |
Administrators rights to require a performance test and force majeure provisions |
Yes |
|
|
63.7(b) through (d) |
Notification of performance test, quality assurance program, and testing facilities |
Yes |
|
|
63.7(e)(1) |
Performance test conditions |
No |
This subpart specifies performance test conditions. |
|
63.7(e)(2) through (4), (f) through (h) |
Other performance testing requirements |
Yes |
|
|
63.8(a)(1) through (3), (b), (c)(1)(ii), (c)(2) through (3), (c)(6) through (8), (d)(1) through (2) |
Monitoring requirements |
Yes |
|
|
63.8(a)(4) |
Additional monitoring requirements for control devices in § 63.11 |
No |
This subpart does not require flares. |
|
63.8(c)(1)(i), (c)(1)(iii) |
Operation and maintenance of continuous monitoring systems |
No |
Not necessary in light of other requirements of § 63.8 that apply. |
|
63.8(c)(4) |
CMS requirements |
No |
This subpart specifies requirements for operation of CMS and CEMS. |
|
63.8(c)(5) |
Continuous opacity monitoring system (COMS) Minimum Procedures |
No |
This subpart does not require COMS. |
|
63.8(d)(3) |
Quality control program |
No |
This subpart specifies records that must be kept associated with site-specific performance evaluation test plan. |
|
63.8(e), (f)(1) through (6), (g)(1) through (4) |
Performance evaluations and alternative monitoring |
Yes |
This subpart specifies requirements for alternative monitoring systems. |
|
63.8(g)(5) |
Data reduction |
No |
This subpart specifies data reduction requirements. |
|
63.9 |
Notification requirements |
Yes |
Except: for opacity performance tests, this subpart allows the notification of compliance status to be submitted with the semiannual compliance report or the semiannual part 70 of this chapter monitoring report. |
|
63.10(a),(b)(1), (b)(2)(iii) and (vi) through (xiv), (b)(3), (c)(1) through (6), (c)(9) through (14), (d)(1) through (4), (e)(1) through (2), (f) |
Recordkeeping and reporting requirements |
Yes |
Additional records for CMS in § 63.10(c)(1)-(6), (9)-(15) apply only to CEMS. |
|
63.10(b)(2)(i), (ii), (iv) and (v) |
Recordkeeping for startup, shutdown, and malfunction events |
No |
|
|
63.10(c)(7), (8) and (15) |
Records of excess emissions and parameter monitoring exceedances for CMS |
No |
This subpart specifies records requirements. |
|
63.10(d)(5) |
Periodic startup, shutdown, and malfunction reports |
No |
|
|
63.10(e)(3) |
Excess emissions reports |
No |
This subpart specifies reporting requirements. |
|
63.10(e)(4) |
Reporting COMS data |
No |
This subpart data does not require COMS. |
|
63.11 |
Control device requirements |
No |
This subpart does not require flares. |
|
63.12 |
State authority and delegations |
Yes |
|
|
63.13(a) |
Reporting to EPA regional offices |
Yes |
Except: reports and notifications required to be submitted to CEDRI meet this obligation through electronic reporting. |
|
63.13(b) through 63.15 |
Addresses of state air pollution control agencies. Incorporation by reference. Availability of information and confidentiality |
Yes |
Cite this article: FindLaw.com - Code of Federal Regulations Title 40. Protection of Environment 40 CFR Pt. 63, Subpt. EEEEE, Tbl. 1 Table 1 to Subpart EEEEE of Part 63—Applicability of General Provisions to Subpart EEEEE - last updated January 02, 2025 | https://codes.findlaw.com/cfr/title-40-protection-of-environment/cfr-pt-40-63-subpt-eeeee-tbl-1/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)