This section applies to tank barge cleaning facilities (TBCFs) collecting vapors of flammable, combustible, or non-high flash point liquid cargoes.
(a) A vapor control system (VCS) with a single facility vapor connection that processes vapor with a vapor recovery unit must—
(1) Have a detonation arrester located as close as practicable to the facility vapor connection. The total pipe length between the detonation arrester and the facility vapor connection must not exceed 18 meters (59.1 feet) and the vapor piping between the detonation arrester and the facility vapor connection must be protected from any potential internal or external ignition source; or
(2) Have an inerting, enriching, or diluting system that meets the requirements of 33 CFR 154.2107.
(b) A VCS with a single facility vapor connection that processes vapor with a vapor destruction unit must—
(1) Have a detonation arrester located as close as practicable to the facility vapor connection. The total pipe length between the detonation arrester and the facility vapor connection must not exceed 18 meters (59.1 feet) and the vapor piping between the detonation arrester and the facility vapor connection must be protected from any potential internal or external ignition source; and
(2) Have an inerting, enriching, or diluting system that meets the requirements of 33 CFR 154.2107.
(c) A VCS with multiple facility vapor connections that processes vapor with a vapor recovery unit must have a detonation arrester located as close as practicable to each facility vapor connection. The total pipe length between the detonation arrester and each facility vapor connection must not exceed 18 meters (59.1 feet) and the vapor piping between the detonation arrester and the facility vapor connection must be protected from any potential internal or external ignition source.
(d) A VCS with multiple facility vapor connections that processes vapor with a vapor destruction unit must—
(1) Have a detonation arrester located as close as practicable to each facility vapor connection. The total pipe length between the detonation arrester and each facility vapor connection must not exceed 18 meters (59.1 feet) and the vapor piping between the detonation arrester and the facility vapor connection must be protected from any potential internal or external ignition source; and
(2) Have an inerting, enriching, or diluting system that meets the requirements of 33 CFR 154.2107.
(e)33 CFR 154.2105(j) applies to a TBCF's VCS.
Cite this article: FindLaw.com - Code of Federal Regulations Title 33. Navigation and Navigable Waters § 33.154.2204 Fire, explosion, and detonation protection - last updated January 02, 2025 | https://codes.findlaw.com/cfr/title-33-navigation-and-navigable-waters/cfr-sect-33-154-2204/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)