Pillar recovery shall be conducted in the following manner, unless otherwise specified in the roof control plan:
(a) Full and partial pillar recovery shall not be conducted on the same pillar line, except where physical conditions such as unstable floor or roof, falls of roof, oil and gas well barriers or surface subsidence require that pillars be left in place.
(b) Before mining is started in a pillar split or lift—
(1) At least two rows of breaker posts or equivalent support shall be installed—
(i) As close to the initial intended breakline as practicable; and
(ii) Across each opening leading into an area where full or partial pillar extraction has been completed.
(2) A row of roadside-radius (turn) posts or equivalent support shall be installed leading into the split or lift.
(c) Before mining is started on a final stump—
(1) At least 2 rows of posts or equivalent support shall be installed on not more than 4–foot centers on each side of the roadway; and
(2) Only one open roadway, which shall not exceed 16 feet wide, shall lead from solid pillars to the final stump of a pillar. Where posts are used as the sole means of roof support, the width of the roadway shall not exceed 14 feet.
(d) During open-end pillar extraction, at least 2 rows of breaker posts or equivalent support shall be installed on not more than 4–foot centers. These supports shall be installed between the lift to be started and the area where pillars have been extracted. These supports shall be maintained to within 7 feet of the face and the width of the roadway shall not exceed 16 feet. Where posts are used as the sole means of roof support, the width of the roadway shall not exceed 14 feet.
Cite this article: FindLaw.com - Code of Federal Regulations Title 30. Mineral Resources § 30.75.207 Pillar recovery - last updated January 02, 2025 | https://codes.findlaw.com/cfr/title-30-mineral-resources/cfr-sect-30-75-207/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)