Learn About The Law
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Current as of January 02, 2025 | Updated by Findlaw Staff
To comply with § 585.708(a)(4), the CVA or project engineer must make periodic onsite inspections while installation is in progress and must, as appropriate, verify, witness, survey, or check, the installation items required by this section.
(a) The CVA or project engineer must verify, as appropriate, all of the following:
(1) Loadout and initial flotation procedures;
(2) Towing operation procedures to the specified location, and review the towing records;
(3) Launching and uprighting activities;
(4) Submergence activities;
(5) Pile or anchor installations;
(6) Installation of mooring and tethering systems;
(7) Final deck and component installations; and
(8) Installation at the approved location according to the Facility Design Report and the Fabrication and Installation Report.
(b) For a fixed or floating facility, the CVA or project engineer must verify that proper procedures were used during the following:
(1) The loadout of the jacket, decks, piles, or structures from each fabrication site; and
(2) The actual installation of the facility or major modification and the related installation activities.
(c) For a floating facility, the CVA or project engineer must verify that proper procedures were used during the following:
(1) The loadout of the facility;
(2) The installation of foundation pilings and templates, and anchoring systems; and
(3) The installation of the mooring and tethering systems.
(d) The CVA or project engineer must conduct an onsite survey of the facility after transportation to the approved location.
(e) The CVA or project engineer must spot-check the equipment, procedures, and recordkeeping as necessary to determine compliance with the applicable documents incorporated by reference and the regulations under this part.
Cite this article: FindLaw.com - Code of Federal Regulations Title 30. Mineral Resources § 30.585.710 When conducting onsite installation inspections, what must the CVA or project engineer do? - last updated January 02, 2025 | https://codes.findlaw.com/cfr/title-30-mineral-resources/cfr-sect-30-585-710/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)