Learn About The Law
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Current as of January 02, 2025 | Updated by Findlaw Staff
Acronyms and terms used in this subpart have the following meanings:
(a) Acronyms used frequently in this subpart are listed alphabetically below:
BOEM means Bureau of Ocean Energy Management.
BSEE means Bureau of Safety and Environmental Enforcement.
CID means Conservation Information Document.
CZMA means Coastal Zone Management Act.
DOCD means Development Operations Coordination Document.
DPP means Development and Production Plan.
DWOP means Deepwater Operations Plan.
EIA means Environmental Impact Analysis.
EP means Exploration Plan.
IOP means Integrated Operations Plan.
NPDES means National Pollutant Discharge Elimination System.
NTL means Notice to Lessees and Operators.
OCS means Outer Continental Shelf.
(b) Terms used in this subpart are listed alphabetically below:
Amendment means a change you make to an EP, DPP, or DOCD that is pending before BOEM for a decision (see §§ 550.232(d) and 550.267(d)).
Modification means a change required by the Regional Supervisor to an EP, DPP, or DOCD (see § 550.233(b)(2) and § 550.270(b)(2)) that is pending before BOEM for a decision because the OCS plan is inconsistent with applicable requirements.
New or unusual technology means equipment or procedures that:
(1) Have not been used previously or extensively in a BOEM OCS Region;
(2) Have not been used previously under the anticipated operating conditions; or
(3) Have operating characteristics that are outside the performance parameters established by this part.
Non-conventional production or completion technology includes, but is not limited to, floating production systems, tension leg platforms, spars, floating production, storage, and offloading systems, guyed towers, compliant towers, subsea manifolds, and other subsea production components that rely on a remote site or host facility for utility and well control services.
Offshore vehicle means a vehicle that is capable of being driven on ice.
Resubmitted OCS plan means an EP, DPP, or DOCD that contains changes you make to an OCS plan that BOEM has disapproved (see §§ 550.234(b), 550.272(a), and 550.273(b)).
Revised OCS plan means an EP, DPP, or DOCD that proposes changes to an approved OCS plan, such as those in the location of a well or platform, type of drilling unit, or location of the onshore support base (see § 550.283(a)).
Supplemental OCS plan means an EP, DPP, or DOCD that proposes the addition to an approved OCS plan of an activity that requires approval of an application or permit (see § 550.283(b)).
Cite this article: FindLaw.com - Code of Federal Regulations Title 30. Mineral Resources § 30.550.200 Definitions - last updated January 02, 2025 | https://codes.findlaw.com/cfr/title-30-mineral-resources/cfr-sect-30-550-200/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw’s Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)