Current as of October 02, 2022 | Updated by FindLaw Staff
If you choose to install a subsea water injection system, your system must comply with your approved DWOP, which must meet the following minimum requirements:
(a) Adhere to the water injection requirements described in API RP 14C (incorporated by reference as specified in § 250.198) for the water injection equipment located on the platform. In accordance with § 250.830, either a surface-controlled SSSV or a water injection valve (WIV) that is self-activated and not controlled by emergency shut-down (ESD) or sensor activation must be installed in a subsea water injection well.
(b) Equip a water injection pipeline with a surface FSV and water injection shutdown valve (WISDV) on the surface facility.
(c) Install a PSHL sensor upstream (in-board) of the FSV and WISDV.
(d) Use subsea tree(s), wellhead(s), connector(s), and tree valves, and surface-controlled SSSV or WIV associated with a water injection system that are rated for the maximum anticipated injection pressure.
(e) Consider the effects of hydrogen sulfide (H2S) when designing your water flood system, as required by § 250.805.
(f) Follow the valve closure times and hydraulic bleed requirements according to your approved DWOP for the following:
(1) Electro-hydraulic control system with water injection,
(2) Electro-hydraulic control system with water injection with loss of communications, and
(3) Direct-hydraulic control system with water injection.
(g) Comply with the following injection valve testing requirements:
(1) You must test your injection valves as provided in the following table:
Valve |
Allowable leakage rate |
Testing frequency |
---|---|---|
(i) WISDV |
Zero leakage |
Monthly, not to exceed 6 weeks between tests. |
(ii) Surface-controlled SSSV or WIV |
400 cc per minute of liquid or |
Semiannually, not to exceed |
15 scf per minute of gas |
6 calendar months between tests. |
(2) If a designated USV on a water injection well fails the applicable test under § 250.880(c)(4)(ii), you must notify the appropriate District Manager and request approval to designate another ANSI/API Spec 6A and API Spec. 6AV1 (both incorporated by reference in § 250.198) certified subsea valve as your USV.
(3) If a USV on a water injection well fails the test and the surface-controlled SSSV or WIV cannot be tested as required under (g)(1)(ii) of this section because of low reservoir pressure, you must submit a request to the appropriate District Manager with an alternative plan that ensures subsea shutdown capabilities.
(h) If you experience a loss of communications during water injection operations, you must comply with the following:
(1) Notify the appropriate District Manager within 12 hours after detecting loss of communication; and
(2) Obtain approval from the appropriate District Manager to continue to inject during the loss of communication.
Cite this article: FindLaw.com - Code of Federal Regulations Title 30. Mineral Resources § 30.250.874 Subsea water injection systems - last updated October 02, 2022 | https://codes.findlaw.com/cfr/title-30-mineral-resources/cfr-sect-30-250-874/
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature or via Westlaw before relying on it for your legal needs.
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw's Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)