U.S. Federal and State Cases, Codes, and Articles
Select a tab to search United States Cases, Codes, or Articles
U.S. Federal and State Cases, Codes, and Articles
Select a tab to search United States Cases, Codes, or Articles
Search for cases
Indicates required field
Search by keyword or citation
Indicates required field
Search blogs, article pages, and cases and codes
Indicates required field
Current as of October 02, 2022 | Updated by FindLaw Staff
(a) For stationary locomotives at load cells:
(1) Each noise emission test shall begin after the engine of the locomotive has attained the normal cooling water operating temperature as prescribed by the locomotive manufacturer.
(2) Noise emission testing in idle or maximum throttle setting shall start after a 40 second stabilization period in the throttle setting selected for the test.
(3) After the stabilization period as prescribed in paragraph (a)(2) of this section, the A-weighted sound level reading in decibels shall be observed for an additional 30–second period in the throttle setting selected for the test.
(4) The maximum A-weighted sound level reading in decibels that is observed during the 30–second period of time prescribed in paragraph (a)(3) of this section shall be used for test measurement purposes.
(b) The following data determined by any locomotive noise emission test conducted after December 31, 1976, shall be recorded in the “Remarks” section on the reverse side of Form F 6180.49:
(1) Location of test;
(2) Type of test;
(3) Date of test; and
(4) The A-weighted sound level reading in decibels obtained during the passby test, or the readings obtained at idle throttle setting and maximum throttle setting during a load cell test.
(c) Any locomotive subject to this part that is found not to be in compliance with the Standards as a result of a passby test shall be subjected to a load cell test or another passby test prior to return to service, except that no such retest shall be required if the cause of the noise defect is readily apparent and is corrected by the replacement of defective components or by a normal maintenance or repair procedure.
(d) The last entry recorded on Form F 6180.49 as required in paragraph (b) of this section shall be transcribed to a new Form FRA F 6180.49 when it is posted in the locomotive cab.
(e) Locomotives tested pursuant to the procedures prescribed in this part and in the Standards shall be considered in noncompliance wherever the test measurement, minus the appropriate tolerance (§ 210.25), exceeds the noise emission levels prescribed in Appendix A of this part.
Cite this article: FindLaw.com - Code of Federal Regulations Title 49. Transportation § 49.210.31 Operation standards (stationary locomotives at 30 meters) - last updated October 02, 2022 | https://codes.findlaw.com/cfr/title-49-transportation/cfr-sect-49-210-31.html
FindLaw Codes may not reflect the most recent version of the law in your jurisdiction. Please verify the status of the code you are researching with the state legislature or via Westlaw before relying on it for your legal needs.
Response sent, thank you
A free source of state and federal court opinions, state laws, and the United States Code. For more information about the legal concepts addressed by these cases and statutes, visit FindLaw's Learn About the Law.
Get help with your legal needs
FindLaw’s Learn About the Law features thousands of informational articles to help you understand your options. And if you’re ready to hire an attorney, find one in your area who can help.
Search our directory by legal issue
Enter information in one or both fields (Required)